Feasibility study of four dimension (4D) virtual construction tool to mitigate delays during construction /
The problem of delays in the construction industry is a global phenomenon and the construction industry in Malaysia is no exception. In the current day context, despite significant benefits in terms of time and cost savings gained through the systematic use of 4D technologies on construction project...
Saved in:
Main Author: | Julia Mohd Nor |
---|---|
Format: | Thesis |
Language: | English |
Published: |
Kuala Lumpur:
Kulliyyah of Architecture abd Environmental Design, International Islamic University Malaysia,
2011
|
Subjects: | |
Online Access: | http://studentrepo.iium.edu.my/handle/123456789/2650 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis of the intial public offer of four companies in the construction industry in Singapore /
by: Lee, Cher Ling
Published: (1986) -
A study of contractor's attitude towards integration of M & E works in construction projects /
by: Lee, Julia Yew Fong
Published: (1998) -
Level of constructability and design management in the Singapore construction industry /
by: Lim, Kon Wen
Published: (1998) -
Export of construction services /
by: Quak, Ser Khoon
Published: (1991) -
Construction industry : study of the retrofitting sector /
by: Chee, Miew Ling
Published: (1992)