Force majeure in building contract : a comparative study of Saudi Arabia and Malaysia /

Force majeure literally means "irresistible compulsion or coercion". Under the contract law, force majeure clauses may exempt a party or both parties of the contract from the obligation to perform the contract. The events or circumstances of force majeure generally arise from unforeseen in...

Full description

Saved in:
Bibliographic Details
Main Author: Ahmad, Albarak Hada (Author)
Format: Thesis
Language:English
Published: Kuala Lumpur: Ahmad Ibrahim Kulliyyah of Laws, International Islamic University Malaysia, 2012
Subjects:
Online Access:Click here to view 1st 24 pages of the thesis. Members can view fulltext at the specified PCs in the library.
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 037730000a22004450004500
008 120918s2012 my a f m 000 0 eng d
040 |a UIAM  |b eng  |e rda 
041 |a eng 
043 |a a-my--- 
084 |a BPH161.2 
100 1 |a Ahmad, Albarak Hada,  |e author 
245 1 0 |a Force majeure in building contract :  |b a comparative study of Saudi Arabia and Malaysia /  |c by Albarak Hada Ahmad 
264 1 |a Kuala Lumpur:   |b Ahmad Ibrahim Kulliyyah of Laws, International Islamic University Malaysia,  |c 2012 
300 |a xiii, 203 leaves :  |b illustrations ;  |c 30cm. 
336 |2 rdacontent  |a text 
337 |2 rdamedia  |a unmediated 
337 |2 rdamedia  |a computer 
338 |2 rdacarrier  |a volume 
338 |2 rdacarrier  |a computer disc 
338 |2 rdacarrier  |a online resource 
347 |2 rdaft  |a text file  |b PDF 
500 |a Abstracts in English and Arabic. 
500 |a " A dissertation submitted in fulfilment of the requirement for the degree of Master of Comparative Law."--On title page. 
502 |a Thesis (MCL)--International Islamic University Malaysia, 2012. 
504 |a  Includes bibliographical references (leaves 75-78). 
520 |a Force majeure literally means "irresistible compulsion or coercion". Under the contract law, force majeure clauses may exempt a party or both parties of the contract from the obligation to perform the contract. The events or circumstances of force majeure generally arise from unforeseen incidents which are beyond the control of the contractual parties and such events prevent the parties from performing their obligations under the contract. The most common example of force majeure events are "act of God" (such as natural disasters, earthquakes, typhoons, big floods) and "act of man", like wars and changes oflaws. In Saudi Arabia, the law is based upon Shari' ah principles and future circumstances are perceived under Shariah as being neither predictable nor controllable; instead it is God who knows how things will turn out However, this study highlighted that Shariah recognizes the principle of pacta· sunt servanda which facilitates the usage of Force under the Islamic law. This study also highlighted that in Malaysia, force majeure clause is recognized under the contract law .and has been adopted as a standard clause in the Malaysian standard form of building contracts such as the PWD 203.A and PAM. standard form for construction contract. This study looks into the application of force majeure clause in building contracts in two countries, namely Saudi Arabia and Malaysia. This study highlights the similarities and differences between Malaysian and Saudi Arabian laws on force majeure·with special reference to its application in standard form building contracts. 
596 |a 1 
650 0 |a Impossibility of performance (Islamic law)  |z Saudi Arabia 
650 0 |a Impossibility of performance  |z Malaysia 
650 0 |a Vis major (Civil law) 
650 0 |a Construction contracts 
655 7 |a Theses, IIUM local 
690 |a Dissertations, Academic  |x Department of Civil Law  |z IIUM 
710 2 |a International Islamic University Malaysia.  |b Department of Civil Law 
856 |u http://studentrepo.iium.edu.my/handle/123456789/1519  |z Click here to view 1st 24 pages of the thesis. Members can view fulltext at the specified PCs in the library. 
900 |a sbh-aaz-ls-naw 
999 |c 437253  |c 437253  |d 469520  |d 469520 
999 |c 437253  |c 437253  |d 469520  |d 469520 
952 |0 0  |6 T BPH 161.2 A36 2012  |7 0  |8 THESES  |9 758195  |a IIUM  |b IIUM  |c MULTIMEDIA  |g 0.00  |o t BPH 161.2 A36 2012  |p 00011269796  |r 2018-10-01  |t 1  |v 0.00  |y THESIS 
952 |0 0  |6 TS CDF BPH 161.2 A36 2012  |7 0  |8 THESES  |9 849607  |a IIUM  |b IIUM  |c MULTIMEDIA  |g 0.00  |o ts cdf BPH 161.2 A36 2012  |p 00011105459  |r 2018-10-01  |t 1  |v 0.00  |y THESISDIG