Kays, H. M. E. (2015). Balancing and scheduling of car floor subassembly production flow line. Kulliyyah of Engineering, International Islamic University Malaysia.
Chicago Style (17th ed.) CitationKays, H. M. Emrul. Balancing and Scheduling of Car Floor Subassembly Production Flow Line. Kuala Lumpur: Kulliyyah of Engineering, International Islamic University Malaysia, 2015.
MLA (8th ed.) CitationKays, H. M. Emrul. Balancing and Scheduling of Car Floor Subassembly Production Flow Line. Kulliyyah of Engineering, International Islamic University Malaysia, 2015.
Warning: These citations may not always be 100% accurate.