Kays, H. M. E. (2015). Balancing and scheduling of car floor subassembly production flow line. Kulliyyah of Engineering, International Islamic University Malaysia.
Chicago Style (17th ed.) CitationKays, H. M. Emrul. Balancing and Scheduling of Car Floor Subassembly Production Flow Line. Kuala Lumpur: Kulliyyah of Engineering, International Islamic University Malaysia, 2015.
MLA引文Kays, H. M. Emrul. Balancing and Scheduling of Car Floor Subassembly Production Flow Line. Kulliyyah of Engineering, International Islamic University Malaysia, 2015.
警告:這些引文格式不一定是100%准確.