A study of factors that contribute to the perception of under-usage of project management software in construction industry in Malaysia /

Earlier studies on adoption of ICT in Malaysian construction industry give the impression that Project Management (PM) software is not being utilized to the extent that it should be in the said industry. To identify possible contributing factors to this "perceived under-utilization" of PM...

Full description

Saved in:
Bibliographic Details
Main Author: Long Ahmad Burhanuddin bin Long Hassan
Format: Thesis
Language:English
Published: Kuala Lumpur : Kulliyyah of Architecture and Environmental Design, International Islamic University Malaysia, 2014
Subjects:
Online Access:Click here to view 1st 24 pages of the thesis. Members can view fulltext at the specified PCs in the library.
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 028560000a22002770004500
008 170928t2014 my a g m 000 0 eng d
040 |a UIAM  |b eng 
041 |a eng 
043 |a a-my--- 
050 |a HD9715 
100 1 |a Long Ahmad Burhanuddin bin Long Hassan 
245 1 2 |a A study of factors that contribute to the perception of under-usage of project management software in construction industry in Malaysia /  |c by Long Ahmad Burhanuddin bin Long Hassan 
260 |a Kuala Lumpur :  |b Kulliyyah of Architecture and Environmental Design, International Islamic University Malaysia,  |c 2014 
300 |a xii, 95 leaves :  |b ill. ;  |c 30cm. 
502 |a Thesis (MBA)--International Islamic University Malaysia, 2014. 
504 |a Includes bibliographical references (leaves 86-90). 
520 |a Earlier studies on adoption of ICT in Malaysian construction industry give the impression that Project Management (PM) software is not being utilized to the extent that it should be in the said industry. To identify possible contributing factors to this "perceived under-utilization" of PM software in Malaysian construction industry, a questionnaire survey was carried out. Out of a list of possible factors derived from literature, seven factors were investigated. namely; education leveL acquisition of ICT training by employees, number of years of using PM software, experience with PM software in terms of ·'ease of use'' and ''usefulness". internet connectivity, budget allocations by companies to purchase computer hardware and software. and budget allocations by companies for ICT training for employees. The questionnaire forms were sent out to 700 construction-related companies in Kuala Lumpur and Selangor and 65 responses were received. It was found that budget allocation by employers for ICT training of employees, budget allocation by employers for purchase of computer hardware and software. access to formal and structured ICT training for construction personnel, and the number of years of having used PM sofnvare, contribute to the perceived under-utilization of PM software in Malaysian construction industry. 
596 |a 1 
655 7 |a Theses, IIUM local 
690 |a Dissertations, Academic  |x Management Centre  |z IIUM 
710 2 |a International Islamic University Malaysia.  |b Management Centre 
856 4 |u http://studentrepo.iium.edu.my/handle/123456789/2904  |z Click here to view 1st 24 pages of the thesis. Members can view fulltext at the specified PCs in the library. 
900 |a sbh-lfr-hm 
999 |c 438685  |d 467439 
952 |0 0  |6 T HD 009715 L848S 2014  |7 0  |8 THESES  |9 759745  |a IIUM  |b IIUM  |c MULTIMEDIA  |g 0.00  |o t HD 9715 L848S 2014  |p 11100323919  |r 2017-11-02  |t 1  |v 0.00  |y THESIS 
952 |0 0  |6 TS CDF HD 9715 L848S 2014  |7 0  |8 THESES  |9 852478  |a IIUM  |b IIUM  |c MULTIMEDIA  |g 0.00  |o ts cdf HD 9715 L848S 2014  |p 00011093759  |r 2017-11-02  |t 1  |v 0.00  |y THESISDIG