Investigation on construction project delays in Malaysia /
Delay is commonly happens in the construction industry that causes time extension for contractors to complete the construction project and as well as increases the cost of project. It tends to occur among small and medium contractors with limited personnel capabilities and abilities. The objectives...
محفوظ في:
المؤلف الرئيسي: | Amalin Sofia binti Ismail (مؤلف) |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
Kuala Lumpur :
Kulliyyah of Architecture and Environmental Design, International Islamic University Malaysia,
2017
|
الموضوعات: | |
الوصول للمادة أونلاين: | Click here to view 1st 24 pages of the thesis. Members can view fulltext at the specified PCs in the library. |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Defect analysis of HDB buildings /
بواسطة: Yap, Eng Seng
منشور في: (1994) -
Defects rectification of HDB flats /
بواسطة: Ng, Chwee Geok
منشور في: (1994) -
Alternative arrangements for handling post contract latent defects /
بواسطة: Lai, Weng Hoo
منشور في: (1991) -
Recovery plan strategy on the delay construction project
بواسطة: Ku Ismail, Ku Adenan
منشور في: (2004) -
Project delays recovery on construction work
بواسطة: Adiwati, Shinta
منشور في: (1999)