Conflict management in engineering construction : a case study of Kuwait International Airport Cargo City /
Exchanges within construction teams have often been found to be argumentative, conflict, and crisis-ridden, and as a result, the individual worker in the industry is exposed to extreme hostility. These conflicts result from disagreements about ways of solving on-the-spot site-related problems, insuf...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
Kuala Lumpur :
Kulliyyah of Engineering, International Islamic University Malaysia,
2019
|
主题: | |
在线阅读: | http://studentrepo.iium.edu.my/handle/123456789/9450 |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
成为第一个发表评论!