Method-related Charges (MRC) : the cost effects which related to the claims /

In construction projects, the Bill of Quantities (BQ) is used to provide a detailed description of the total value of an item and serve as a normal payment mechanism for work procured by the related parties, such as contractors. However, the Bill of Quantities (BQ) has some essential flaws, the bigg...

Full description

Saved in:
Bibliographic Details
Main Author: Norazmi bin Fadilah (Author)
Format: Thesis
Language:English
Published: Kuala Lumpur : Kulliyyah of Architecture and Environmental Design, International Islamic University Malaysia, 2018
Subjects:
Online Access:http://studentrepo.iium.edu.my/handle/123456789/2706
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 041010000a22003010004500
008 180809s2018 my a f m 000 0 eng d
040 |a UIAM  |b eng  |e rda 
041 |a eng 
043 |a a-my--- 
050 0 0 |a TA682.26 
100 0 |a Norazmi bin Fadilah,  |e author 
245 1 0 |a Method-related Charges (MRC) :  |b the cost effects which related to the claims /  |c by Norazmi bin Fadilah 
264 1 |a Kuala Lumpur :  |b Kulliyyah of Architecture and Environmental Design, International Islamic University Malaysia,  |c 2018 
300 |a xv, 116 leaves :  |b illustrations ;  |c 30cm. 
336 |2 rdacontent  |a text 
347 |2 rdaft  |a text file  |b PDF 
502 |a Thesis (MQSIP)--International Islamic University Malaysia, 2018. 
504 |a Includes bibliographical references (leaves 110-114). 
520 |a In construction projects, the Bill of Quantities (BQ) is used to provide a detailed description of the total value of an item and serve as a normal payment mechanism for work procured by the related parties, such as contractors. However, the Bill of Quantities (BQ) has some essential flaws, the biggest of which being that construction costs are rarely directly proportional to the quantity. The effect of this flaw may be minimal if changes in the scope of the works are few, as the difference between the contractor's costs and income will remain small. The concept of Method-related Charges (MRC) will increase the change in scope that can be accommodated. Nevertheless, friction often results when significant changes in scope or methods occur, as the contractor struggles to justify any additional entitlement and to show where his extra costs come from. This research aims to investigate the issues pertaining to the Method-related Charges (MRC). The focus of the research is on how to evaluate the cost effects of Method-related Charger (MRC) on construction and to develop measures to minimize the impact of cost related issues raised under Method-related Charges (MRC) claims. Another difficulty arises with Method-related Charges (MRC) items, which is that the Civil Engineering Standard Method of Measurement (CESMM) clause states that a Method-related Charges (MRC) does not bind the contractor to use the method defined; it is not subject to admeasurement; and is not to be increased or decreased for any change method adopted by the contractor. This research uses an explanatory paradigm approach in exploring the issue by employing a qualitative method. Data collection is comprised of interviews and document reviews that aim to investigate the issue of Method-related Charges (MRC), to evaluate the cost effects of Method-related Charges (MRC), and therefore to minimize the cost related issues in the claim of Method-related Charges (MRC). Interviews were conducted among construction practitioners and content analysis was used to analyse the data collected. Validation of the findings from this research is achieved through triangulation of interviews and document analysis. The findings from this research found that Method-related Charges (MRC) enables the contractor optionally to enter separately in the tender such non-quantity proportional charges as considered will have a significant influence on the cost of the works and for which the contractor omits to enter into Method-related Charges (MRC). The significant outcomes of this research are expected to give a new perspective on the Method-related Charges (MRC). 
596 |a 1 
655 7 |a Theses, IIUM local 
690 |a Dissertations, Academic  |x Department of Quantity Surveying  |z IIUM 
710 2 |a International Islamic University Malaysia.  |b Department of Quantity Surveying 
856 4 |u http://studentrepo.iium.edu.my/handle/123456789/2706 
900 |a sbh-aaz-rmb 
999 |c 440649  |d 472342 
952 |0 0  |6 T TA 000682.26 N822M 2018  |7 0  |8 THESES  |9 762400  |a IIUM  |b IIUM  |c MULTIMEDIA  |g 0.00  |o t TA 682.26 N822M 2018  |p 11100405069  |r 2020-07-17  |t 1  |v 0.00  |y THESIS 
952 |0 0  |6 TS CDF TA 682.26 N822M 2018  |7 0  |8 THESES  |9 857525  |a IIUM  |b IIUM  |c MULTIMEDIA  |g 0.00  |o ts cdf TA 682.26 N822M 2018  |p 11100405070  |r 2020-07-16  |t 1  |v 0.00  |y THESISDIG