Total productive maintenance (TPM) implementation based on lean manufacturing tools /

This research was aimed to explore the implementation of Total Productive Maintenance (TPM) pillars and Lean Manufacturing (LM) tools as well as to investigate barriers and enablers in their implementations in Indonesian manufacturing industries. Another primary focus of this research was to develop...

Full description

Saved in:
Bibliographic Details
Main Author: Prabowo, Herry Agung (Author)
Format: Thesis
Language:English
Published: Kuala Lumpur : Kulliyyah of Engineering, 2019
Subjects:
Online Access:http://studentrepo.iium.edu.my/handle/123456789/9688
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 040930000a22003850004500
040 |a UIAM  |b eng  |e rda 
041 |a eng 
043 |a a-my--- 
050 4 |a TS192 
100 1 |a Prabowo, Herry Agung,  |e author  |9 14790 
245 1 |a Total productive maintenance (TPM) implementation based on lean manufacturing tools /  |c by Herry Agung Prabowo 
264 1 |a Kuala Lumpur :  |b Kulliyyah of Engineering,  |c 2019 
300 |a xviii, 202 leaves :  |b colour illustrations ;  |c 30cm. 
336 |2 rdacontent  |a text 
337 |2 rdamedia  |a unmediated 
337 |2 rdamedia  |a computer 
338 |2 rdacarrier  |a volume 
338 |2 rdacarrier  |a online resource 
500 |a Abstracts in English and Arabic. 
500 |a "A thesis submitted in fulfilment of the requirement for the degree of Doctor of Philosophy (Engineering)." --On title page. 
502 |6 Thesis (Ph.D)--International Islamic University Malaysia, 2019. 
504 |a Includes bibliographical references (leaves 158-167). 
520 |a This research was aimed to explore the implementation of Total Productive Maintenance (TPM) pillars and Lean Manufacturing (LM) tools as well as to investigate barriers and enablers in their implementations in Indonesian manufacturing industries. Another primary focus of this research was to develop reference models for both measurement and structural TPM pillars, LM tools and Manufacturing Performance (MP). A total of 132 questionnaires were sent to 132 manufacturing companies from 5 different industrial estates in Jakarta, Tangerang, Bekasi, Cilegon and Batam. A total of 108 questionnaires returned and only 91 were found suitable to be analysed. The findings indicate a reasonably good implementation of TPM and LM in Indonesian manufacturing industries. However, TPM performance in terms of Overall Equipment Effectiveness (OEE) value seems to be unsatisfactory, with the average value of 52.5 compared to the world class OEE with a value of 85%. There were 5 enablers and 7 barriers significantly influencing the success of TPM implementation, while 4 enablers and 5 barriers were found in the LM tools implementation. Six pillars of TPM were considered to be valid, reliable, and significant to represent the TPM implementation in Indonesia, while the other two were found to be nullified. All of the eight LM tools were also considered to be valid, reliable and significant. TPM was found to have a strong correlation with LM but has a weak correlation with MP. On the other hand, TPM has an indirect and moderate influence on MP through OEE and also LM tools. There was also evidence indicating that OEE has a strong direct influence towards MP. Lean manufacturing also has a moderate correlation with MP. The TPM pillars and LM tools have a significant and positive impact to MP simultanously. The influence of both on MP is 60.9% (R2 = 0.609) in proposed model but increased to 74.8% in the revised (final) model (R2 = 0.748). It also means that 74.8% variability of MP can be explained by TPM and LM, while 25.2% can be explained by the others. This model can be considered as a reference on the impact of TPM pillars and LM tools implementation over manufacturing performance in Indonesian manufacturing industries. 
650 0 |a Total productive maintenance   |z Indonesia  |9 14820 
650 0 |a Lean manufacturing  |z Indonesia  |9 14821 
650 0 |a Industrial management  |z Indonesia  |9 14822 
655 7 |a Theses, IIUM local 
690 |a Dissertations, Academic  |x Kulliyyah of Engineering  |z IIUM 
710 2 |a International Islamic University Malaysia.  |b Kulliyyah of Engineering  |9 4827 
856 |u http://studentrepo.iium.edu.my/handle/123456789/9688 
900 |a sz-nbm 
942 |2 lcc 
999 |c 441360  |d 472550 
952 |0 0  |1 0  |2 lcc  |4 0  |6 T T S192 P00088T 02019  |7 3  |8 IIUMTHESIS  |9 762779  |a IIUM  |b IIUM  |c THESIS  |d 2022-09-06  |g 0.00  |o t TS 192 P88T 2019  |p 11100417527  |r 1900-01-02  |t 1  |v 0.00  |y THESIS 
952 |0 0  |1 0  |2 lcc  |4 0  |6 TS C D F TS 00192 P00088T 02019  |7 3  |8 IIUMTHESIS  |9 858847  |a IIUM  |b IIUM  |c THESIS  |d 2022-09-06  |g 0.00  |o ts cdf TS 192 P88T 2019  |p 11100417528  |r 1900-01-02  |t 1  |v 0.00  |y THESISDIG