Bayesian-Based Downlink Scheduling Algorithm for Long Term Evolution (LTE)

With the rising demand for faster internet connections for multimedia application features, LTE has been chosen as the medium of transmission to fulfil these demands. The need to handle multiple simultaneous users with real-time transmission containing either voice or audio is the challenge that LTE...

Full description

Saved in:
Bibliographic Details
Main Author: Kamarul Hatta, Khairul Anwar
Format: Thesis
Published: 2016
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:With the rising demand for faster internet connections for multimedia application features, LTE has been chosen as the medium of transmission to fulfil these demands. The need to handle multiple simultaneous users with real-time transmission containing either voice or audio is the challenge that LTE is now facing. Hence, this research is develop a new real-time oriented downlink scheduling algorithm with the capability of handling a multiple simultaneous user environment. A criterion-based (C-B) downlink scheduling algorithm is designed by incorporating a Bayesian information criterion (BIC) as the profit function of the algorithms. Criterion-based proportional fairness (C-BPF) is designed for the fairness focus, while another algorithm named criterion-based modified largest weighted delay first (C-BMLWDF), which adapts a profit function from an existing downlink scheduler, has also been developed. BIC is suitable for selection based on a set of criteria within a finite model. A new solution is found from the research, which leads to the use of a true Bayesian estimate (TBE) as the new solution’s profit function. TBE is capable of handling multivariate parameters in a large pool, which makes it better at solving multiple simultaneous user issues. Three TBE-based algorithms are created: true Bayesian estimate delay (TBE-D) focuses on delay prioritisation, true Bayesian estimate fairness (TBE-F) focuses on the fairness properties of the scheduling, and a balanced approach is made by true Bayesian flow delay (TBE-FD), which focuses on the delay in each flow as well as the number of flows of the current transmission.