Hierarchical Production Planning, Framework For The Batch Production Environment With Setup Time And Setup Cost Restrictions
In this research, the production planning and scheduling problems in unison with detailed sequencing activities are addressed for a single stage, multi-product batch chemical plant in a parallel machines environment. An integrated framework for production planning and scheduling of a single stage mu...
Saved in:
Main Author: | Teo , Siew Chein |
---|---|
Format: | Thesis |
Published: |
2005
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Minimising total tardiness for hybrid flowshop with batch-discrete processors, setup times, and distinct job sizes
by: Teo, Siew Chein
Published: (2013) -
Setup planning using Hopfield neural network and simulated annealing /
by: Chen, Jiang
Published: (1997) -
An integrated approach to production planning and scheduling for multiple products batch with intermittent demand
by: Khaled Omar, Mohamed
Published: (1999) -
A study of high variety and low volume manufacturing setup /
by: Asraf Ali Mohammad Ali
Published: (2011) -
Integrated Approach For Production Planning And Sequencing Decisions In A Single Machine Batch Process
by: Suppiah, Yasothei
Published: (2005)