An integrated computer package for productivity, cost control and schedule control systems (INPROMA) / Noorman Nordin

Most project analysist have the dream of integrating cost, productivity and schedule function. In practice it is very difficult to achieve the same. Often it is observed CPM engineers producing schedules and cost engineers working on budget and completion status, with little correlation between this...

Full description

Saved in:
Bibliographic Details
Main Author: Nordin, Noorman
Format: Thesis
Language:English
Published: 1993
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/104886/1/104886.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uitm-ir.104886
record_format uketd_dc
spelling my-uitm-ir.1048862024-10-14T03:49:31Z An integrated computer package for productivity, cost control and schedule control systems (INPROMA) / Noorman Nordin 1993 Nordin, Noorman Electronic Computers. Computer Science Most project analysist have the dream of integrating cost, productivity and schedule function. In practice it is very difficult to achieve the same. Often it is observed CPM engineers producing schedules and cost engineers working on budget and completion status, with little correlation between this three function. This project attempt to developed a software package which will make the three function integrate or related each others. 1993 Thesis https://ir.uitm.edu.my/id/eprint/104886/ https://ir.uitm.edu.my/id/eprint/104886/1/104886.pdf text en public advanced_diploma MARA Institute of Technology Faculty of Civil Engineering Ismail, Ariffin
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
advisor Ismail, Ariffin
topic Electronic Computers
Computer Science
spellingShingle Electronic Computers
Computer Science
Nordin, Noorman
An integrated computer package for productivity, cost control and schedule control systems (INPROMA) / Noorman Nordin
description Most project analysist have the dream of integrating cost, productivity and schedule function. In practice it is very difficult to achieve the same. Often it is observed CPM engineers producing schedules and cost engineers working on budget and completion status, with little correlation between this three function. This project attempt to developed a software package which will make the three function integrate or related each others.
format Thesis
qualification_level advanced_diploma
author Nordin, Noorman
author_facet Nordin, Noorman
author_sort Nordin, Noorman
title An integrated computer package for productivity, cost control and schedule control systems (INPROMA) / Noorman Nordin
title_short An integrated computer package for productivity, cost control and schedule control systems (INPROMA) / Noorman Nordin
title_full An integrated computer package for productivity, cost control and schedule control systems (INPROMA) / Noorman Nordin
title_fullStr An integrated computer package for productivity, cost control and schedule control systems (INPROMA) / Noorman Nordin
title_full_unstemmed An integrated computer package for productivity, cost control and schedule control systems (INPROMA) / Noorman Nordin
title_sort integrated computer package for productivity, cost control and schedule control systems (inproma) / noorman nordin
granting_institution MARA Institute of Technology
granting_department Faculty of Civil Engineering
publishDate 1993
url https://ir.uitm.edu.my/id/eprint/104886/1/104886.pdf
_version_ 1818588124844916736