An integrated computer package for productivity, cost control and schedule control systems (INPROMA) / Noorman Nordin
Most project analysist have the dream of integrating cost, productivity and schedule function. In practice it is very difficult to achieve the same. Often it is observed CPM engineers producing schedules and cost engineers working on budget and completion status, with little correlation between this...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
1993
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/104886/1/104886.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|