Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa

The final exam invigilation schedule in UiTM Malacca Jasin campus is prepared by UiTM Pulau Pinang Scheduling System, where all the factors and information of lecturers’ constraint being sent there by the Examination Unit. There is always a delay in waiting for the invigilation schedule to be announ...

Full description

Saved in:
Bibliographic Details
Main Author: Mustapa, Maizatul Akmam
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/14532/1/14532.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uitm-ir.14532
record_format uketd_dc
spelling my-uitm-ir.145322021-10-06T06:52:34Z Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa 2015 Mustapa, Maizatul Akmam Melaka Programming. Rule-based programming. Backtrack programming The final exam invigilation schedule in UiTM Malacca Jasin campus is prepared by UiTM Pulau Pinang Scheduling System, where all the factors and information of lecturers’ constraint being sent there by the Examination Unit. There is always a delay in waiting for the invigilation schedule to be announced. If there are any changes of the schedule after the schedule is generated, the schedule will not be updated in the system. The schedule changing process is done manually by form. The Exam Invigilation Scheduling System aims to own a scheduling system in the campus and reduce the time used in creating the invigilation schedule. To solve the invigilation scheduling problem, constraint based technique with rule based approach is used to find the optimal solution. Rule based technique is used in searching method and involve knowledge base as the data constraint store. In developing the project, software prototyping model was used which involves of the preliminary investigation, requirement definition, system design, system development, system testing and system prototype phase. Two interviews have been conducted as data collection method. The findings of the project include the system requirements and rules. There were ten rules involved in creating the invigilation schedule. The project does not assist in changing the invigilator assigned in the invigilation schedule. Thus, it is recommended to provide function that allows the application of schedule changes for future works. 2015 Thesis https://ir.uitm.edu.my/id/eprint/14532/ https://ir.uitm.edu.my/id/eprint/14532/1/14532.pdf text en public other degree Universiti Teknologi MARA Faculty of Computer and Mathematical Sciences
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
topic Melaka
Melaka
spellingShingle Melaka
Melaka
Mustapa, Maizatul Akmam
Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa
description The final exam invigilation schedule in UiTM Malacca Jasin campus is prepared by UiTM Pulau Pinang Scheduling System, where all the factors and information of lecturers’ constraint being sent there by the Examination Unit. There is always a delay in waiting for the invigilation schedule to be announced. If there are any changes of the schedule after the schedule is generated, the schedule will not be updated in the system. The schedule changing process is done manually by form. The Exam Invigilation Scheduling System aims to own a scheduling system in the campus and reduce the time used in creating the invigilation schedule. To solve the invigilation scheduling problem, constraint based technique with rule based approach is used to find the optimal solution. Rule based technique is used in searching method and involve knowledge base as the data constraint store. In developing the project, software prototyping model was used which involves of the preliminary investigation, requirement definition, system design, system development, system testing and system prototype phase. Two interviews have been conducted as data collection method. The findings of the project include the system requirements and rules. There were ten rules involved in creating the invigilation schedule. The project does not assist in changing the invigilator assigned in the invigilation schedule. Thus, it is recommended to provide function that allows the application of schedule changes for future works.
format Thesis
qualification_name other
qualification_level Bachelor degree
author Mustapa, Maizatul Akmam
author_facet Mustapa, Maizatul Akmam
author_sort Mustapa, Maizatul Akmam
title Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa
title_short Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa
title_full Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa
title_fullStr Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa
title_full_unstemmed Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa
title_sort exam invigilation scheduling system for uitm malacca jasin campus / maizatul akmam mustapa
granting_institution Universiti Teknologi MARA
granting_department Faculty of Computer and Mathematical Sciences
publishDate 2015
url https://ir.uitm.edu.my/id/eprint/14532/1/14532.pdf
_version_ 1783733285952684032