Statutory procedure and planning machinery for urban development in Sarawak / Mohammad Yusup

This study is conducted to analyse the planning system in Sarawak within the context of overall planning components that govern the urban development in Sarawak. Weaknesses in the legal framework, planning administration, development plans as well as the development control system hindered the devel...

Full description

Saved in:
Bibliographic Details
Main Author: Yusup, Mohammad
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/15566/2/15566.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uitm-ir.15566
record_format uketd_dc
spelling my-uitm-ir.155662024-06-04T06:51:20Z Statutory procedure and planning machinery for urban development in Sarawak / Mohammad Yusup 2013 Yusup, Mohammad Architecture and state Malaysia This study is conducted to analyse the planning system in Sarawak within the context of overall planning components that govern the urban development in Sarawak. Weaknesses in the legal framework, planning administration, development plans as well as the development control system hindered the development process in Sarawak. The scopes of the study include the legal provision that shapes the planning system in Sarawak, the planning administrative system that governs the development process, the development plan instruments that used as guidance for current and future development and the development control machinery that facilitates the development process in Sarawak. Part X of Sarawak Land Code 1958 (Cap. 81) is used as the main reference in the planning system since the amendment made in 1997. According to the analyses ,the Part X of Sarawak Land Code 1958 (Cap. 81) is incapable to guide the whole development process in Sarawak due to incomprehensiveness of provision related to the urban planning. Analyses show that the centralisation of power by the State Planning Authority has caused single-tier planning administration structure in Sarawak. As a consequence of incomprehensiveness of provision with regards to the development plan system in Part X of the Sarawak Land Code 1958 (Cap. 81), the development plan in Sarawak is prepared in piecemeal and ad-hoc method which causes a lot of non-statutory planning and development process in Sarawak. Inefficiency in granting planning approval is due to the weaknesses in decision making process that include incomprehensive procedure of preparation of the development plans as well as the centralisation of power by the State Planning Authority. It is suggested that to solve the issues and problems that prevail in the planning system in Sarawak, independent and comprehensive planning enactment is indeed needed for Sarawak in order to achieve more systematic and comprehensive town planning system. 2013 Thesis https://ir.uitm.edu.my/id/eprint/15566/ https://ir.uitm.edu.my/id/eprint/15566/2/15566.pdf text en public mphil masters Universiti Teknologi MARA Faculty of Architecture, Planning and Surveying Arshad, Ahmad Fuzi
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
advisor Arshad, Ahmad Fuzi
topic Architecture and state
Malaysia
spellingShingle Architecture and state
Malaysia
Yusup, Mohammad
Statutory procedure and planning machinery for urban development in Sarawak / Mohammad Yusup
description This study is conducted to analyse the planning system in Sarawak within the context of overall planning components that govern the urban development in Sarawak. Weaknesses in the legal framework, planning administration, development plans as well as the development control system hindered the development process in Sarawak. The scopes of the study include the legal provision that shapes the planning system in Sarawak, the planning administrative system that governs the development process, the development plan instruments that used as guidance for current and future development and the development control machinery that facilitates the development process in Sarawak. Part X of Sarawak Land Code 1958 (Cap. 81) is used as the main reference in the planning system since the amendment made in 1997. According to the analyses ,the Part X of Sarawak Land Code 1958 (Cap. 81) is incapable to guide the whole development process in Sarawak due to incomprehensiveness of provision related to the urban planning. Analyses show that the centralisation of power by the State Planning Authority has caused single-tier planning administration structure in Sarawak. As a consequence of incomprehensiveness of provision with regards to the development plan system in Part X of the Sarawak Land Code 1958 (Cap. 81), the development plan in Sarawak is prepared in piecemeal and ad-hoc method which causes a lot of non-statutory planning and development process in Sarawak. Inefficiency in granting planning approval is due to the weaknesses in decision making process that include incomprehensive procedure of preparation of the development plans as well as the centralisation of power by the State Planning Authority. It is suggested that to solve the issues and problems that prevail in the planning system in Sarawak, independent and comprehensive planning enactment is indeed needed for Sarawak in order to achieve more systematic and comprehensive town planning system.
format Thesis
qualification_name Master of Philosophy (M.Phil.)
qualification_level Master's degree
author Yusup, Mohammad
author_facet Yusup, Mohammad
author_sort Yusup, Mohammad
title Statutory procedure and planning machinery for urban development in Sarawak / Mohammad Yusup
title_short Statutory procedure and planning machinery for urban development in Sarawak / Mohammad Yusup
title_full Statutory procedure and planning machinery for urban development in Sarawak / Mohammad Yusup
title_fullStr Statutory procedure and planning machinery for urban development in Sarawak / Mohammad Yusup
title_full_unstemmed Statutory procedure and planning machinery for urban development in Sarawak / Mohammad Yusup
title_sort statutory procedure and planning machinery for urban development in sarawak / mohammad yusup
granting_institution Universiti Teknologi MARA
granting_department Faculty of Architecture, Planning and Surveying
publishDate 2013
url https://ir.uitm.edu.my/id/eprint/15566/2/15566.pdf
_version_ 1804889557590605824