Mixed integer goal programming model for flexible job shop scheduling problem (FJSSP) with load balancing / Shirley Sinatra Gran
In manufacturing-related industries, scheduling of resources and tasks play an important role in improving efficiency and productivityas well as reducing costs. Job shop scheduling problem (JSSP) concerns with the problem whereby there is only one machine that can process one type of operation. The...
Saved in:
Main Author: | Gran, Shirley Sinatra |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2014
|
Online Access: | https://ir.uitm.edu.my/id/eprint/16450/1/TM_SHIRLEY%20SINATRA%20GRAN%20CS%2014_5.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Integer programming approach for scheduling multi-stage multi-product flow-shop /
by: Nur Salihah binti Abdul Rahman
Published: (2019) -
Optimal scheduling of industrial block operations using mixed integer programming /
by: Leong, Hon Kong
Published: (1979) -
Coordinated generation and transmission maintenance scheduling using mixed integer linear programming
by: Hussin, Siti Maherah
Published: (2016) -
Mixed integer programming (mip) model for production scheduling in an automotive part company
by: Kamaruddin, Aisyah Nabilah
Published: (2010) -
Intelligent Design of Scheduling in Dynamic Environments of Flexible Flow Shop
by: Loong, Ying Tai
Published: (2019)