Study on the determination of nominated subcontractor / Mohd Izwan Shah Fadzil

In a construction industry there are various problems that may arise. Due to this findings, two important document was introduced namely PAM 98 and PWD 203, where it gives a guide to how contract works are done and carried out and to ensure all parties benefit the same. A study was made on this topi...

Full description

Saved in:
Bibliographic Details
Main Author: Shah Fadzil, Mohd Izwan
Format: Thesis
Language:English
Published: 2003
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/26694/2/26694.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uitm-ir.26694
record_format uketd_dc
spelling my-uitm-ir.266942022-12-21T04:24:42Z Study on the determination of nominated subcontractor / Mohd Izwan Shah Fadzil 2003 Shah Fadzil, Mohd Izwan Maintenance and repair Contractors In a construction industry there are various problems that may arise. Due to this findings, two important document was introduced namely PAM 98 and PWD 203, where it gives a guide to how contract works are done and carried out and to ensure all parties benefit the same. A study was made on this topic and the findings were, with the introduction of both form has benefited both parties namely the main contractor and the nominated subcontractor. If this is not taken into account project may be delayed and this will require extra expanses with this finding even if there is a dispute between the main contractor and subcontractor. It can be resolved due to these clauses in the contract document and with this finding all parties would be very careful in making any mistake during construction works. The findings also indicates that main contractor has the right to terminate any subcontractor due to default of any manner. The findings also indicates that the subcontractor is also able to demand extra payment if the works does not follow the existing contract. Overall these findings have made all parties to bided to the contract document and with great caution. 2003 Thesis https://ir.uitm.edu.my/id/eprint/26694/ https://ir.uitm.edu.my/id/eprint/26694/2/26694.pdf text en public degree Universiti Teknologi MARA (UiTM) Faculty of Architecture, Planning and Surveying Hashim, Suliahti
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
advisor Hashim, Suliahti
topic Maintenance and repair
Contractors
spellingShingle Maintenance and repair
Contractors
Shah Fadzil, Mohd Izwan
Study on the determination of nominated subcontractor / Mohd Izwan Shah Fadzil
description In a construction industry there are various problems that may arise. Due to this findings, two important document was introduced namely PAM 98 and PWD 203, where it gives a guide to how contract works are done and carried out and to ensure all parties benefit the same. A study was made on this topic and the findings were, with the introduction of both form has benefited both parties namely the main contractor and the nominated subcontractor. If this is not taken into account project may be delayed and this will require extra expanses with this finding even if there is a dispute between the main contractor and subcontractor. It can be resolved due to these clauses in the contract document and with this finding all parties would be very careful in making any mistake during construction works. The findings also indicates that main contractor has the right to terminate any subcontractor due to default of any manner. The findings also indicates that the subcontractor is also able to demand extra payment if the works does not follow the existing contract. Overall these findings have made all parties to bided to the contract document and with great caution.
format Thesis
qualification_level Bachelor degree
author Shah Fadzil, Mohd Izwan
author_facet Shah Fadzil, Mohd Izwan
author_sort Shah Fadzil, Mohd Izwan
title Study on the determination of nominated subcontractor / Mohd Izwan Shah Fadzil
title_short Study on the determination of nominated subcontractor / Mohd Izwan Shah Fadzil
title_full Study on the determination of nominated subcontractor / Mohd Izwan Shah Fadzil
title_fullStr Study on the determination of nominated subcontractor / Mohd Izwan Shah Fadzil
title_full_unstemmed Study on the determination of nominated subcontractor / Mohd Izwan Shah Fadzil
title_sort study on the determination of nominated subcontractor / mohd izwan shah fadzil
granting_institution Universiti Teknologi MARA (UiTM)
granting_department Faculty of Architecture, Planning and Surveying
publishDate 2003
url https://ir.uitm.edu.my/id/eprint/26694/2/26694.pdf
_version_ 1783733898854793216