Study on the determination of nominated subcontractor / Mohd Izwan Shah Fadzil
In a construction industry there are various problems that may arise. Due to this findings, two important document was introduced namely PAM 98 and PWD 203, where it gives a guide to how contract works are done and carried out and to ensure all parties benefit the same. A study was made on this topi...
محفوظ في:
المؤلف الرئيسي: | Shah Fadzil, Mohd Izwan |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2003
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://ir.uitm.edu.my/id/eprint/26694/2/26694.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Keberkesanan penggunaan IT dalam membantu pengurusan kontrak-kontrak JKR (modul skala) / Mohd Fadzil Yusoff
بواسطة: Yusoff, Mohd Fadzil
منشور في: (2003) -
The effectiveness of maintenance management of services in shopping complex building : Plaza Alam Sentral, Shah Alam / Syed Mohamad Fahmi Wafa Syed Jalaluddin
بواسطة: Syed Jalaluddin, Syed Mohamad Fahmi Wafa
منشور في: (2009) -
The effectiveness of maintenance infrastructure work in UiTM / Meor Mohd Fadzli Zahid
بواسطة: Zahid, Meor Mohd Fadzli
منشور في: (2005) -
The necessity of the refurbishment at the shopping complex from the customers' points of view case study: Kompleks Teruntum, Kuantan,Pahang Darul Makmur / Mastura Musa
بواسطة: Musa, Mastura
منشور في: (2010) -
A case study on demolition work in Malaysia / Mohd. Zafarizan Mohd. Sarbini
بواسطة: Mohd. Sarbini, Mohd. Zafarizan
منشور في: (2009)