Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar
The actual condition of Teruntum Complex, unfortunately shows a significant drawback of retailers, customers and thus contribute to maximum loss of profit, for the once popular shopping complex in Kuantan, Pahang. The needs to outlined the aspects of feasibility studies become the main intention of...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2001
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/26705/2/26705.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-uitm-ir.26705 |
---|---|
record_format |
uketd_dc |
spelling |
my-uitm-ir.267052022-12-20T03:00:35Z Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar 2001 Abu Bakar, Noor Kamisah Estimates. Measurements. Quantities and cost Management of the construction site. Superintendence of building construction The actual condition of Teruntum Complex, unfortunately shows a significant drawback of retailers, customers and thus contribute to maximum loss of profit, for the once popular shopping complex in Kuantan, Pahang. The needs to outlined the aspects of feasibility studies become the main intention of this dissertation, as clearly defined from the title of the dissertation “Feasibility Studies On Teruntum Complex, Kuantan”. Chapter 1 of this dissertation contains the introduction of this dissertation, including the objectives, issues, scopes and research method. Background studies will be featured in Chapter 2 which emphasise several background research as general review on the feasibility stua.es and shopping complex development in Malaysia. Aspects on market studies that emphasise the evaluation on the surrounding area of Kuantan is the main topic of Chapter 3. The aspects of the market studies include the study on the competitors, socio-economic and site potential, as well as other related aspects. Chapter 4 contains the aspects of feasibility studies on Teruntum Complex, which focus on the existing condition of this shopping complex, including all details on previous aims and future plans. Chapter 5 is a compilation of analysis and reviews based on the studies as reveal in Chapter 3 and Chapter 4; while Chapter 6 is the conclusion of the dissertation’s title and topic with additional section on recommendations. 2001 Thesis https://ir.uitm.edu.my/id/eprint/26705/ https://ir.uitm.edu.my/id/eprint/26705/2/26705.pdf text en public degree Universiti Teknologi MARA (UiTM) Faculty of Architecture, Planning and Surveying Abu Bakar, Mazlan |
institution |
Universiti Teknologi MARA |
collection |
UiTM Institutional Repository |
language |
English |
advisor |
Abu Bakar, Mazlan |
topic |
Estimates Measurements Quantities and cost Estimates Measurements Quantities and cost |
spellingShingle |
Estimates Measurements Quantities and cost Estimates Measurements Quantities and cost Abu Bakar, Noor Kamisah Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar |
description |
The actual condition of Teruntum Complex, unfortunately shows a significant drawback of retailers, customers and thus contribute to maximum loss of profit, for the once popular shopping complex in Kuantan, Pahang. The needs to outlined the aspects of feasibility studies become the main intention of this dissertation, as clearly defined from the title of the dissertation “Feasibility Studies On Teruntum Complex, Kuantan”. Chapter 1 of this dissertation contains the introduction of this dissertation, including the objectives, issues, scopes and research method. Background studies will be featured in Chapter 2 which emphasise several background research as general review on the feasibility stua.es and shopping complex development in Malaysia. Aspects on market studies that emphasise the evaluation on the surrounding area of Kuantan is the main topic of Chapter 3. The aspects of the market studies include the study on the competitors, socio-economic and site potential, as well as other related aspects. Chapter 4 contains the aspects of feasibility studies on Teruntum Complex, which focus on the existing condition of this shopping complex, including all details on previous aims and future plans. Chapter 5 is a compilation of analysis and reviews based on the studies as reveal in Chapter 3 and Chapter 4; while Chapter 6 is the conclusion of the dissertation’s title and topic with additional section on recommendations. |
format |
Thesis |
qualification_level |
Bachelor degree |
author |
Abu Bakar, Noor Kamisah |
author_facet |
Abu Bakar, Noor Kamisah |
author_sort |
Abu Bakar, Noor Kamisah |
title |
Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar |
title_short |
Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar |
title_full |
Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar |
title_fullStr |
Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar |
title_full_unstemmed |
Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar |
title_sort |
feasibility studies on teruntum complex, kuantan / noor kamisah abu bakar |
granting_institution |
Universiti Teknologi MARA (UiTM) |
granting_department |
Faculty of Architecture, Planning and Surveying |
publishDate |
2001 |
url |
https://ir.uitm.edu.my/id/eprint/26705/2/26705.pdf |
_version_ |
1783733901331529728 |