Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar

The actual condition of Teruntum Complex, unfortunately shows a significant drawback of retailers, customers and thus contribute to maximum loss of profit, for the once popular shopping complex in Kuantan, Pahang. The needs to outlined the aspects of feasibility studies become the main intention of...

全面介绍

Saved in:
书目详细资料
主要作者: Abu Bakar, Noor Kamisah
格式: Thesis
语言:English
出版: 2001
主题:
在线阅读:https://ir.uitm.edu.my/id/eprint/26705/2/26705.pdf
标签: 添加标签
没有标签, 成为第一个标记此记录!
id my-uitm-ir.26705
record_format uketd_dc
spelling my-uitm-ir.267052022-12-20T03:00:35Z Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar 2001 Abu Bakar, Noor Kamisah Estimates. Measurements. Quantities and cost Management of the construction site. Superintendence of building construction The actual condition of Teruntum Complex, unfortunately shows a significant drawback of retailers, customers and thus contribute to maximum loss of profit, for the once popular shopping complex in Kuantan, Pahang. The needs to outlined the aspects of feasibility studies become the main intention of this dissertation, as clearly defined from the title of the dissertation “Feasibility Studies On Teruntum Complex, Kuantan”. Chapter 1 of this dissertation contains the introduction of this dissertation, including the objectives, issues, scopes and research method. Background studies will be featured in Chapter 2 which emphasise several background research as general review on the feasibility stua.es and shopping complex development in Malaysia. Aspects on market studies that emphasise the evaluation on the surrounding area of Kuantan is the main topic of Chapter 3. The aspects of the market studies include the study on the competitors, socio-economic and site potential, as well as other related aspects. Chapter 4 contains the aspects of feasibility studies on Teruntum Complex, which focus on the existing condition of this shopping complex, including all details on previous aims and future plans. Chapter 5 is a compilation of analysis and reviews based on the studies as reveal in Chapter 3 and Chapter 4; while Chapter 6 is the conclusion of the dissertation’s title and topic with additional section on recommendations. 2001 Thesis https://ir.uitm.edu.my/id/eprint/26705/ https://ir.uitm.edu.my/id/eprint/26705/2/26705.pdf text en public degree Universiti Teknologi MARA (UiTM) Faculty of Architecture, Planning and Surveying Abu Bakar, Mazlan
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
advisor Abu Bakar, Mazlan
topic Estimates
Measurements
Quantities and cost
Estimates
Measurements
Quantities and cost
spellingShingle Estimates
Measurements
Quantities and cost
Estimates
Measurements
Quantities and cost
Abu Bakar, Noor Kamisah
Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar
description The actual condition of Teruntum Complex, unfortunately shows a significant drawback of retailers, customers and thus contribute to maximum loss of profit, for the once popular shopping complex in Kuantan, Pahang. The needs to outlined the aspects of feasibility studies become the main intention of this dissertation, as clearly defined from the title of the dissertation “Feasibility Studies On Teruntum Complex, Kuantan”. Chapter 1 of this dissertation contains the introduction of this dissertation, including the objectives, issues, scopes and research method. Background studies will be featured in Chapter 2 which emphasise several background research as general review on the feasibility stua.es and shopping complex development in Malaysia. Aspects on market studies that emphasise the evaluation on the surrounding area of Kuantan is the main topic of Chapter 3. The aspects of the market studies include the study on the competitors, socio-economic and site potential, as well as other related aspects. Chapter 4 contains the aspects of feasibility studies on Teruntum Complex, which focus on the existing condition of this shopping complex, including all details on previous aims and future plans. Chapter 5 is a compilation of analysis and reviews based on the studies as reveal in Chapter 3 and Chapter 4; while Chapter 6 is the conclusion of the dissertation’s title and topic with additional section on recommendations.
format Thesis
qualification_level Bachelor degree
author Abu Bakar, Noor Kamisah
author_facet Abu Bakar, Noor Kamisah
author_sort Abu Bakar, Noor Kamisah
title Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar
title_short Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar
title_full Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar
title_fullStr Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar
title_full_unstemmed Feasibility studies on Teruntum Complex, Kuantan / Noor Kamisah Abu Bakar
title_sort feasibility studies on teruntum complex, kuantan / noor kamisah abu bakar
granting_institution Universiti Teknologi MARA (UiTM)
granting_department Faculty of Architecture, Planning and Surveying
publishDate 2001
url https://ir.uitm.edu.my/id/eprint/26705/2/26705.pdf
_version_ 1783733901331529728