Factors contributing to the delaying of electricity bill payment among TNB consumers: a case study at TNB Tanah Merah / Noor Hidayah Mohd Faisal Baskaran
The aim of the study was to examine the factors that contribute to the delaying of electricity bill payment among TNB consumers in Tanah Merah Kelantan. There are three factors being studied, which are: bill presentment, payment method and consumers’ attitude. TNB organisation has been chosen as the...
Saved in:
Main Author: | Mohd Faisal Baskaran, Noor Hidayah |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/32925/1/32925.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A study on factors contributing to delays in TNB transmission line projects
by: Narayanan Nair, Purushothaman Nair
Published: (2004) -
The effectiveness of enhanced Customer Information Billing System (eCIBS) a case study: Tenaga Nasional Berhad (TNB) / Noor Faidatul Nisha Ibrahim
by: Ibrahim, Noor Faidatul Nisha
Published: (2014) -
Feasibility study of the formation of engineering and construction company in TNB /
by: Razali Hanafi
Published: (1996) -
Comtrade-based fault information system for TNB substations
by: Gan, Chin Kim
Published: (2003) -
Perspectives Of Cimb And Tnb In Developing And Managing Of Corporate Identity
by: Bidin, Rosmiza
Published: (2016)