Allocation of time and cost in project management using goal programming case study: Teras Chuping Enterprise / Nur Athirah Amir Hamzah
The allocation of time and cost in a project have always become a common issue faced by most of the company. In the real-life activity, the project manager needs to handle multiple issues that arise regarding the project management such as the projects are not completed on time and the cost is over...
محفوظ في:
المؤلف الرئيسي: | Amir Hamzah, Nur Athirah |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2020
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://ir.uitm.edu.my/id/eprint/34865/1/34865.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Project cost control system for a small enterprise /
بواسطة: Lee, Steven Chak Boon
منشور في: (1993) -
Recurring Project Overrun and Project Management Problems in Engineering and Construction Industries
بواسطة: Lim, Cheong Seng
منشور في: (2001) -
Project management of mega-scale projects /
بواسطة: Lim, Ee Seng
منشور في: (1989) -
Optimum Time-Cost Trade-Off Strategies on Critical Path Method for Project Management
بواسطة: Khalaf, Wakas S.
منشور في: (2010) -
Evaluating IT project requirement in private sector: a case study of TNB / Mohd Khairi Ismayuddin
بواسطة: Ismayuddin, Mohd Khairi
منشور في: (2015)