Development of performance measurement tool (PMT) for operational and maintenance phase in Malaysian Public Private Partnership (PPP) projects / Nor Suzila Lop
Public Private Partnership (PPP) is conceptualised as a performance-based procurement in which concessionaires are contracted to provide efficient facilities and services to the government. The quality of the facilities and services provided by the concessionaires will be assessed using key performa...
Saved in:
主要作者: | Lop, Nor Suzila |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2019
|
主題: | |
在線閱讀: | https://ir.uitm.edu.my/id/eprint/35014/1/35014.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Interpretation of architectural meanings of post-independence Malaysian buildings through semiotic approach / Azlaini Haji Abdul Aziz
由: Haji Abdul Aziz, Azlaini
出版: (2021) -
Evaluating crew satisfaction of working environment in KD JEBAT Warship / Muhammad Hisham Abdul Halim
由: Abdul Halim, Muhammad Hisham
出版: (2022) -
Relationship on residents perception between quality of air and perceived health at PPR Desa Tun Razak / Azureen Kharuddin
由: Kharuddin, Azureen
出版: (2022) -
The influence of biophilic design towards student’s learning ability in University library environment / Nur Afizah Mohd Khair
由: Mohd Khair, Nur Afizah
出版: (2022) -
Emotional response among architecture students toward virtual biophilic design studio / Shahril Khairi Abdul Shukor
由: Abdul Shukor, Shahril Khairi
出版: (2022)