Optimal timetable synchronization for greater Kuala Lumpur using mixed integer programming / Saiyidatul Adidah Idris
Greater Kuala Lumpur transportation system (GKL) operates 11 rail lines and 192stations. Passengers using GKL often missed the next connecting train to their destination. They also frequently must rush to catch this train. This problem may have been caused by unsynchronized tabling of train schedule...
Saved in:
主要作者: | Idris, Saiyidatul Adidah |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2020
|
主题: | |
在线阅读: | https://ir.uitm.edu.my/id/eprint/35200/1/35200.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
A study of three related all-integer programming problems (vig. the T.S. problem, the A.P. and the T.P.) with solutions /
由: Low, Thain Sim
出版: (1978) -
Optimal scheduling of industrial block operations using mixed integer programming /
由: Leong, Hon Kong
出版: (1979) -
Flexural static and fatigue performance of glued laminated timber railway sleepers from selected Malaysian tropical heavy hardwood / Norshariza Mohamad Bhkari
由: Mohamad Bhkari, Norshariza
出版: (2018) -
Analysis on the frequency of passenger train delay (Keretapi Tanah Melayu Berhad) / Khadijah Ishak
由: Ishak, Khadijah
出版: (1994) -
A framework for project capital management in rail joint venture projects / Norsyakilah Romeli
由: Romeli, Norsyakilah
出版: (2018)