Optimal timetable synchronization for greater Kuala Lumpur using mixed integer programming / Saiyidatul Adidah Idris
Greater Kuala Lumpur transportation system (GKL) operates 11 rail lines and 192stations. Passengers using GKL often missed the next connecting train to their destination. They also frequently must rush to catch this train. This problem may have been caused by unsynchronized tabling of train schedule...
Saved in:
Main Author: | Idris, Saiyidatul Adidah |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2020
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/35200/1/35200.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A study of three related all-integer programming problems (vig. the T.S. problem, the A.P. and the T.P.) with solutions /
by: Low, Thain Sim
Published: (1978) -
Optimal scheduling of industrial block operations using mixed integer programming /
by: Leong, Hon Kong
Published: (1979) -
Flexural static and fatigue performance of glued laminated timber railway sleepers from selected Malaysian tropical heavy hardwood / Norshariza Mohamad Bhkari
by: Mohamad Bhkari, Norshariza
Published: (2018) -
Analysis on the frequency of passenger train delay (Keretapi Tanah Melayu Berhad) / Khadijah Ishak
by: Ishak, Khadijah
Published: (1994) -
A framework for project capital management in rail joint venture projects / Norsyakilah Romeli
by: Romeli, Norsyakilah
Published: (2018)