Work study on industrial production in x-member assembly SRM 24 (welding) at Tracoma Sdn. Bhd. / Wan Mohammad Fadhli Wan Hapandi
Presently, there are many manufacturing companies seeking improvement to their assembly operation in order to reduce the cycle time and increase productivity. To achieve the desired target, all the inefficient elements must be identified and eliminated in order to reduce cycle time. This thesis an...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/38945/1/38945.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!