Work study on industrial production in x-member assembly SRM 24 (welding) at Tracoma Sdn. Bhd. / Wan Mohammad Fadhli Wan Hapandi

Presently, there are many manufacturing companies seeking improvement to their assembly operation in order to reduce the cycle time and increase productivity. To achieve the desired target, all the inefficient elements must be identified and eliminated in order to reduce cycle time. This thesis an...

全面介绍

Saved in:
书目详细资料
主要作者: Wan Hapandi, Wan Mohammad Fadhli
格式: Thesis
语言:English
出版: 2009
主题:
在线阅读:https://ir.uitm.edu.my/id/eprint/38945/1/38945.pdf
标签: 添加标签
没有标签, 成为第一个标记此记录!