Work study on industrial production in x-member assembly SRM 24 (welding) at Tracoma Sdn. Bhd. / Wan Mohammad Fadhli Wan Hapandi

Presently, there are many manufacturing companies seeking improvement to their assembly operation in order to reduce the cycle time and increase productivity. To achieve the desired target, all the inefficient elements must be identified and eliminated in order to reduce cycle time. This thesis an...

Full description

Saved in:
Bibliographic Details
Main Author: Wan Hapandi, Wan Mohammad Fadhli
Format: Thesis
Language:English
Published: 2009
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/38945/1/38945.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!