Delay in school project in Lembah Klang / Hasniza Md. Kasa
A construction organization is an organization that often has to face more crises as compared to other industries. This is due to the problems of securing projects, organization to other industries. This is due to the problems of securing projects, organization and construction, and lack of sources...
Saved in:
Main Author: | Md. Kasa, Hasniza |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2005
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/41304/1/41304.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Pengurusan penyelenggaraan sistem pengagihan air / Azriana Sharif
by: Sharif, Azriana
Published: (2004) -
The use of PV to replace typical skylight and its energy generation for cooling and lighting in Malaysian atria / Ahmad Ridzwan Othman
by: Othman, Ahmad Ridzwan
Published: (2013) -
Towards a modern bus terminal (Kota Bharu Station as study case) / Salmiah Husain.
by: Husain, Salmiah
Published: (2002) -
Risk on design and build for construction project faced by developer / Muhammad Syakirin Ismail
by: Ismail, Muhammad Syakirin
Published: (2003) -
A study of thermal performance of medium cost terraced houses at Shah Alam, Selangor / Md Hanafiah Amin Abdullah
by: Abdullah, Md Hanafiah Amin
Published: (2002)