Delay in school project in Lembah Klang / Hasniza Md. Kasa
A construction organization is an organization that often has to face more crises as compared to other industries. This is due to the problems of securing projects, organization to other industries. This is due to the problems of securing projects, organization and construction, and lack of sources...
Saved in:
主要作者: | Md. Kasa, Hasniza |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2005
|
主題: | |
在線閱讀: | https://ir.uitm.edu.my/id/eprint/41304/1/41304.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Pengurusan penyelenggaraan sistem pengagihan air / Azriana Sharif
由: Sharif, Azriana
出版: (2004) -
The use of PV to replace typical skylight and its energy generation for cooling and lighting in Malaysian atria / Ahmad Ridzwan Othman
由: Othman, Ahmad Ridzwan
出版: (2013) -
Towards a modern bus terminal (Kota Bharu Station as study case) / Salmiah Husain.
由: Husain, Salmiah
出版: (2002) -
Risk on design and build for construction project faced by developer / Muhammad Syakirin Ismail
由: Ismail, Muhammad Syakirin
出版: (2003) -
A study of thermal performance of medium cost terraced houses at Shah Alam, Selangor / Md Hanafiah Amin Abdullah
由: Abdullah, Md Hanafiah Amin
出版: (2002)