Delay in school project in Lembah Klang / Hasniza Md. Kasa
A construction organization is an organization that often has to face more crises as compared to other industries. This is due to the problems of securing projects, organization to other industries. This is due to the problems of securing projects, organization and construction, and lack of sources...
محفوظ في:
المؤلف الرئيسي: | Md. Kasa, Hasniza |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2005
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://ir.uitm.edu.my/id/eprint/41304/1/41304.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Pengurusan penyelenggaraan sistem pengagihan air / Azriana Sharif
بواسطة: Sharif, Azriana
منشور في: (2004) -
The use of PV to replace typical skylight and its energy generation for cooling and lighting in Malaysian atria / Ahmad Ridzwan Othman
بواسطة: Othman, Ahmad Ridzwan
منشور في: (2013) -
Towards a modern bus terminal (Kota Bharu Station as study case) / Salmiah Husain.
بواسطة: Husain, Salmiah
منشور في: (2002) -
Risk on design and build for construction project faced by developer / Muhammad Syakirin Ismail
بواسطة: Ismail, Muhammad Syakirin
منشور في: (2003) -
A study of thermal performance of medium cost terraced houses at Shah Alam, Selangor / Md Hanafiah Amin Abdullah
بواسطة: Abdullah, Md Hanafiah Amin
منشور في: (2002)