The life cycle cost for generator set / Khairul Ariffin Mat Zain

Generator is important aspect in ensuring efficiency level of any building. Currently, there are many existing building that fully utilized generator set as source of energy. Even Malaysia as a country, which has corporatized Lembaga Elektrik Negara (LLN) to Tenaga Nasional Berhad (TNB) because of t...

全面介紹

Saved in:
書目詳細資料
主要作者: Mat Zai, Khairul Ariffin
格式: Thesis
語言:English
出版: 2003
主題:
在線閱讀:https://ir.uitm.edu.my/id/eprint/41343/1/41343.pdf
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
實物特徵
總結:Generator is important aspect in ensuring efficiency level of any building. Currently, there are many existing building that fully utilized generator set as source of energy. Even Malaysia as a country, which has corporatized Lembaga Elektrik Negara (LLN) to Tenaga Nasional Berhad (TNB) because of they have realize the potential of electricity needs for the nation growth. Besides, Malaysia has once been shocked by Nation’s 1997 blackout. Generator set is generating electricity in standby situation for building. In narrower scope, the importance of generator set is much alike the TNB sub-station with exception that the generator set only provided the electricity energy recovery during power interruption or during sub-station maintenance. Therefore, the main objective of this dissertation is to evaluate the case study in aspect of the life cycle cost: ,the cost of maintenance and testing per generator set, the manpower use in maintenance and testing per generator set, time spent for maintenance and testing per generator set. Aside from that, the secondary objective also carried together in this research with data collection from the sample generator set on these matters, to study about privatization in Malaysia especially for hospital maintenance management. To study of generator set start from power part and its operation.