The life cycle cost for generator set / Khairul Ariffin Mat Zain

Generator is important aspect in ensuring efficiency level of any building. Currently, there are many existing building that fully utilized generator set as source of energy. Even Malaysia as a country, which has corporatized Lembaga Elektrik Negara (LLN) to Tenaga Nasional Berhad (TNB) because of t...

全面介紹

Saved in:
書目詳細資料
主要作者: Mat Zai, Khairul Ariffin
格式: Thesis
語言:English
出版: 2003
主題:
在線閱讀:https://ir.uitm.edu.my/id/eprint/41343/1/41343.pdf
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
id my-uitm-ir.41343
record_format uketd_dc
spelling my-uitm-ir.413432022-09-30T08:09:59Z The life cycle cost for generator set / Khairul Ariffin Mat Zain 2003 Mat Zai, Khairul Ariffin Construction equipment in building Generator is important aspect in ensuring efficiency level of any building. Currently, there are many existing building that fully utilized generator set as source of energy. Even Malaysia as a country, which has corporatized Lembaga Elektrik Negara (LLN) to Tenaga Nasional Berhad (TNB) because of they have realize the potential of electricity needs for the nation growth. Besides, Malaysia has once been shocked by Nation’s 1997 blackout. Generator set is generating electricity in standby situation for building. In narrower scope, the importance of generator set is much alike the TNB sub-station with exception that the generator set only provided the electricity energy recovery during power interruption or during sub-station maintenance. Therefore, the main objective of this dissertation is to evaluate the case study in aspect of the life cycle cost: ,the cost of maintenance and testing per generator set, the manpower use in maintenance and testing per generator set, time spent for maintenance and testing per generator set. Aside from that, the secondary objective also carried together in this research with data collection from the sample generator set on these matters, to study about privatization in Malaysia especially for hospital maintenance management. To study of generator set start from power part and its operation. 2003 Thesis https://ir.uitm.edu.my/id/eprint/41343/ https://ir.uitm.edu.my/id/eprint/41343/1/41343.pdf text en public degree Universiti Teknologi MARA Faculty of Architecture, Planning and Surveying Khalid, Ellemy Iskandar
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
advisor Khalid, Ellemy Iskandar
topic Construction equipment in building
spellingShingle Construction equipment in building
Mat Zai, Khairul Ariffin
The life cycle cost for generator set / Khairul Ariffin Mat Zain
description Generator is important aspect in ensuring efficiency level of any building. Currently, there are many existing building that fully utilized generator set as source of energy. Even Malaysia as a country, which has corporatized Lembaga Elektrik Negara (LLN) to Tenaga Nasional Berhad (TNB) because of they have realize the potential of electricity needs for the nation growth. Besides, Malaysia has once been shocked by Nation’s 1997 blackout. Generator set is generating electricity in standby situation for building. In narrower scope, the importance of generator set is much alike the TNB sub-station with exception that the generator set only provided the electricity energy recovery during power interruption or during sub-station maintenance. Therefore, the main objective of this dissertation is to evaluate the case study in aspect of the life cycle cost: ,the cost of maintenance and testing per generator set, the manpower use in maintenance and testing per generator set, time spent for maintenance and testing per generator set. Aside from that, the secondary objective also carried together in this research with data collection from the sample generator set on these matters, to study about privatization in Malaysia especially for hospital maintenance management. To study of generator set start from power part and its operation.
format Thesis
qualification_level Bachelor degree
author Mat Zai, Khairul Ariffin
author_facet Mat Zai, Khairul Ariffin
author_sort Mat Zai, Khairul Ariffin
title The life cycle cost for generator set / Khairul Ariffin Mat Zain
title_short The life cycle cost for generator set / Khairul Ariffin Mat Zain
title_full The life cycle cost for generator set / Khairul Ariffin Mat Zain
title_fullStr The life cycle cost for generator set / Khairul Ariffin Mat Zain
title_full_unstemmed The life cycle cost for generator set / Khairul Ariffin Mat Zain
title_sort life cycle cost for generator set / khairul ariffin mat zain
granting_institution Universiti Teknologi MARA
granting_department Faculty of Architecture, Planning and Surveying
publishDate 2003
url https://ir.uitm.edu.my/id/eprint/41343/1/41343.pdf
_version_ 1783734627518644224