A study on the problems of adopting industrialised building system in Malaysian construction / Sharifah Zulaina Syed Anuar.
The usage of industrialised building system (IBS) in Malaysia building construction industry is still very low if compared to the conventional methods. The industry prefers to utilize the relatively cheap supply of foreign workers to perform the labour intensive construction activities and at the ex...
Saved in:
Main Author: | Syed Anuar, Sharifah Zulaina |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/44918/1/44918.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Keberkesanan kaedah teknologi pembinaan cepat / Sharifah Nur Hafizah Syed Zin
by: Syed Zin, Sharifah Nur Hafizah
Published: (2003) -
Industrialised building system: A case study of maintenance issue during occupational stages / Nur Najwa Fatin Mohayidin
by: Mohayidin, Nur Najwa Fatin
Published: (2021) -
A framework of significant clauses in the standard forms of contract for industrialised building system (IBS) in Malaysia / Mohd Ashraf Mohd Fateh
by: Mohd Fateh, Mohd Ashraf
Published: (2019) -
Contractor acceptance on industrialized building system (IBS) in construction industry / Muhammad Aizat Ismail
by: Ismail, Muhammad Aizat
Published: (2012) -
Industrialised building system’s business model in improving the performance of SME contractors in Malaysia / Mohamed Rizal Mohamed
by: MOhamed, Mohamed Rizal
Published: (2021)