The degree of industrialized building systems implementation for projects in Malaysia / Nader Ardalan Abdul Ghani
Industrialized Building Systems (IBS) is a construction process that utilizes components or building systems which involve prefabricated components and on-site installation. From the structural classification, there are five main IBS groups identified as being used popularly in Malaysia. • Pre-cast...
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2008
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/62661/1/62661.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| id |
my-uitm-ir.62661 |
|---|---|
| record_format |
uketd_dc |
| spelling |
my-uitm-ir.626612023-06-01T09:19:53Z The degree of industrialized building systems implementation for projects in Malaysia / Nader Ardalan Abdul Ghani 2008 Abdul Ghani, Nader Ardalan Construction by phase of the work (Building trades) Industrialized Building Systems (IBS) is a construction process that utilizes components or building systems which involve prefabricated components and on-site installation. From the structural classification, there are five main IBS groups identified as being used popularly in Malaysia. • Pre-cast Concrete Framing, Panel and Box Systems - pre-cast columns, beams, slabs, 3-D components (balconies, staircases, toilets, etc), etc; • Formwork Systems - tunnel forms, EPS-based forms, beams and columns moldings forms, permanent steel formworks, etc; • Steel Framing Systems - steel beams and columns, portal frames, roof trusses, etc; • Prefabricated Timber Framing Systems - timber frames, roof trusses, etc; • Block Work Systems - interlocking concrete masonry units (CMU), lightweight concrete blocks, etc. With the advancement of technology and innovation, various pre-fabricated materials Rave entered the market. It includes gypsum, wood wool, polymer, fiberglass, glass and aluminum-based IBS components. Currently a total of 128 IBS companies have registered with CIDB Malaysia. 2008 Thesis https://ir.uitm.edu.my/id/eprint/62661/ https://ir.uitm.edu.my/id/eprint/62661/1/62661.pdf text en public degree Universiti Teknologi MARA (UiTM) Faculty of Architecture, Planning and Surveying Mohd Amin, Ghazali |
| institution |
Universiti Teknologi MARA |
| collection |
UiTM Institutional Repository |
| language |
English |
| advisor |
Mohd Amin, Ghazali |
| topic |
Construction by phase of the work (Building trades) |
| spellingShingle |
Construction by phase of the work (Building trades) Abdul Ghani, Nader Ardalan The degree of industrialized building systems implementation for projects in Malaysia / Nader Ardalan Abdul Ghani |
| description |
Industrialized Building Systems (IBS) is a construction process that utilizes components or building systems which involve prefabricated components and on-site installation. From the structural classification, there are five main IBS groups identified as being used popularly in Malaysia. • Pre-cast Concrete Framing, Panel and Box Systems - pre-cast columns, beams, slabs, 3-D components (balconies, staircases, toilets, etc), etc; • Formwork Systems - tunnel forms, EPS-based forms, beams and columns moldings forms, permanent steel formworks, etc; • Steel Framing Systems - steel beams and columns, portal frames, roof trusses, etc; • Prefabricated Timber Framing Systems - timber frames, roof trusses, etc; • Block Work Systems - interlocking concrete masonry units (CMU), lightweight concrete blocks, etc. With the advancement of technology and innovation, various pre-fabricated materials Rave entered the market. It includes gypsum, wood wool, polymer, fiberglass, glass and aluminum-based IBS components. Currently a total of 128 IBS companies have registered with CIDB Malaysia. |
| format |
Thesis |
| qualification_level |
Bachelor degree |
| author |
Abdul Ghani, Nader Ardalan |
| author_facet |
Abdul Ghani, Nader Ardalan |
| author_sort |
Abdul Ghani, Nader Ardalan |
| title |
The degree of industrialized building systems implementation for projects in Malaysia / Nader Ardalan Abdul Ghani |
| title_short |
The degree of industrialized building systems implementation for projects in Malaysia / Nader Ardalan Abdul Ghani |
| title_full |
The degree of industrialized building systems implementation for projects in Malaysia / Nader Ardalan Abdul Ghani |
| title_fullStr |
The degree of industrialized building systems implementation for projects in Malaysia / Nader Ardalan Abdul Ghani |
| title_full_unstemmed |
The degree of industrialized building systems implementation for projects in Malaysia / Nader Ardalan Abdul Ghani |
| title_sort |
degree of industrialized building systems implementation for projects in malaysia / nader ardalan abdul ghani |
| granting_institution |
Universiti Teknologi MARA (UiTM) |
| granting_department |
Faculty of Architecture, Planning and Surveying |
| publishDate |
2008 |
| url |
https://ir.uitm.edu.my/id/eprint/62661/1/62661.pdf |
| _version_ |
1783735262848745472 |
