A comparison cost between before and after recovering abandoned project case study: Malaysian Army Academy (ATMA) package II at Sungai Besi Camp for Ministry Defense / Zarina Ishak
Housing is a major concern for all people in every corner of the world as the wellbeing of a country is reflected in its people enjoying a certain standard of living. Among the indicators of wellbeing is housing which provides shelter as well as being a major potential for expanding the construction...
Saved in:
Main Author: | Ishak, Zarina |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2004
|
Online Access: | https://ir.uitm.edu.my/id/eprint/62675/1/62675.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The effectiveness of military training programme at ATMA for RMN trainees /
by: Tang, Jut Weng
Published: (2000) -
The delay at pre-tendering stage of projects in Accommodation and Works Directorate Ministry of Defense Kuala Lumpur
by: Gurmukh Singh, Lakhbir Singh
Published: (2007) -
An exploratory study on the management of the material procurement process of the Ministry of Defence in relation to the Malaysian army /
by: Badrul Hisham Suda
Published: (2000) -
Rombong: Sejarah dan perkembangannya / Zarina Mohd Khairi
by: Mohd Khairi, Zarina
Published: (2000) -
Absorptive capacity and performance in Malaysian manufacturing SMEs / Zarina Denan
by: Denan, Zarina
Published: (2011)