Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi
Bus is one of the main public transportation use by most students in UiTM Shah Alam. The public bus provided the university is one of the benefits provided for the student in the campus to reach classes. Although the students are able to benefits from this public transportation, there are also a few...
محفوظ في:
المؤلف الرئيسي: | |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2017
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://ir.uitm.edu.my/id/eprint/65953/1/65953.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
id |
my-uitm-ir.65953 |
---|---|
record_format |
uketd_dc |
spelling |
my-uitm-ir.659532022-09-21T08:38:51Z Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi 2017 Ahmad Pauzi, Muhd Hisyam Nursalam Bus industry Universiti Teknologi MARA Bus is one of the main public transportation use by most students in UiTM Shah Alam. The public bus provided the university is one of the benefits provided for the student in the campus to reach classes. Although the students are able to benefits from this public transportation, there are also a few downside in the service of the public bus. One of the main reasons is the bus arrival time is unknown to their student as there is timetables provided on the arrival time of the bus.Due to this limitation, the student of UiTM Shah Alam are most likely to waste most of their precious time which can be use to attend others important activities to wait for the bus. In order to avoid this kind of problem from occurring, a system is proposed which is to create a scheduling algorithm to calculate the arrival time of the bus which is then provide the students with the timetables. Dijkstra algorithm is one of the technique use in calculating the arrival time with high accuracy. In realizing this project, Waterfall Methodology Software Development is utilize in managing the project.lt is a methodology which focus on the quality of the requirement and design which is the most suitable for this project that emphasize on the accuracy of time. With the completion of this project, it is hope to provide the students with a timetable that shows the arrival time of the bus which can gives more benefits to the students. 2017 Thesis https://ir.uitm.edu.my/id/eprint/65953/ https://ir.uitm.edu.my/id/eprint/65953/1/65953.pdf text en public degree Universiti Teknologi MARA (UiTM) Faculty of Computer and Mathematical Sciences Wan Hussin, Wan Ya |
institution |
Universiti Teknologi MARA |
collection |
UiTM Institutional Repository |
language |
English |
advisor |
Wan Hussin, Wan Ya |
topic |
Bus industry Universiti Teknologi MARA |
spellingShingle |
Bus industry Universiti Teknologi MARA Ahmad Pauzi, Muhd Hisyam Nursalam Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi |
description |
Bus is one of the main public transportation use by most students in UiTM Shah Alam. The public bus provided the university is one of the benefits provided for the student in the campus to reach classes. Although the students are able to benefits from this public transportation, there are also a few downside in the service of the public bus. One of the main reasons is the bus arrival time is unknown to their student as there is timetables provided on the arrival time of the bus.Due to this limitation, the student of UiTM Shah Alam are most likely to waste most of their precious time which can be use to attend others important activities to wait for the bus. In order to avoid this kind of problem from occurring, a system is proposed which is to create a scheduling algorithm to calculate the arrival time of the bus which is then provide the students with the timetables. Dijkstra algorithm is one of the technique use in calculating the arrival time with high accuracy. In realizing this project, Waterfall Methodology Software Development is utilize in managing the project.lt is a methodology which focus on the quality of the requirement and design which is the most suitable for this project that emphasize on the accuracy of time. With the completion of this project, it is hope to provide the students with a timetable that shows the arrival time of the bus which can gives more benefits to the students. |
format |
Thesis |
qualification_level |
Bachelor degree |
author |
Ahmad Pauzi, Muhd Hisyam Nursalam |
author_facet |
Ahmad Pauzi, Muhd Hisyam Nursalam |
author_sort |
Ahmad Pauzi, Muhd Hisyam Nursalam |
title |
Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi |
title_short |
Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi |
title_full |
Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi |
title_fullStr |
Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi |
title_full_unstemmed |
Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi |
title_sort |
bus scheduling algorithm for uitm shah alam / muhd hisyam nursalam ahmad pauzi |
granting_institution |
Universiti Teknologi MARA (UiTM) |
granting_department |
Faculty of Computer and Mathematical Sciences |
publishDate |
2017 |
url |
https://ir.uitm.edu.my/id/eprint/65953/1/65953.pdf |
_version_ |
1783735588357144576 |