Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi

Bus is one of the main public transportation use by most students in UiTM Shah Alam. The public bus provided the university is one of the benefits provided for the student in the campus to reach classes. Although the students are able to benefits from this public transportation, there are also a few...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: Ahmad Pauzi, Muhd Hisyam Nursalam
التنسيق: أطروحة
اللغة:English
منشور في: 2017
الموضوعات:
الوصول للمادة أونلاين:https://ir.uitm.edu.my/id/eprint/65953/1/65953.pdf
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
id my-uitm-ir.65953
record_format uketd_dc
spelling my-uitm-ir.659532022-09-21T08:38:51Z Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi 2017 Ahmad Pauzi, Muhd Hisyam Nursalam Bus industry Universiti Teknologi MARA Bus is one of the main public transportation use by most students in UiTM Shah Alam. The public bus provided the university is one of the benefits provided for the student in the campus to reach classes. Although the students are able to benefits from this public transportation, there are also a few downside in the service of the public bus. One of the main reasons is the bus arrival time is unknown to their student as there is timetables provided on the arrival time of the bus.Due to this limitation, the student of UiTM Shah Alam are most likely to waste most of their precious time which can be use to attend others important activities to wait for the bus. In order to avoid this kind of problem from occurring, a system is proposed which is to create a scheduling algorithm to calculate the arrival time of the bus which is then provide the students with the timetables. Dijkstra algorithm is one of the technique use in calculating the arrival time with high accuracy. In realizing this project, Waterfall Methodology Software Development is utilize in managing the project.lt is a methodology which focus on the quality of the requirement and design which is the most suitable for this project that emphasize on the accuracy of time. With the completion of this project, it is hope to provide the students with a timetable that shows the arrival time of the bus which can gives more benefits to the students. 2017 Thesis https://ir.uitm.edu.my/id/eprint/65953/ https://ir.uitm.edu.my/id/eprint/65953/1/65953.pdf text en public degree Universiti Teknologi MARA (UiTM) Faculty of Computer and Mathematical Sciences Wan Hussin, Wan Ya
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
advisor Wan Hussin, Wan Ya
topic Bus industry
Universiti Teknologi MARA
spellingShingle Bus industry
Universiti Teknologi MARA
Ahmad Pauzi, Muhd Hisyam Nursalam
Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi
description Bus is one of the main public transportation use by most students in UiTM Shah Alam. The public bus provided the university is one of the benefits provided for the student in the campus to reach classes. Although the students are able to benefits from this public transportation, there are also a few downside in the service of the public bus. One of the main reasons is the bus arrival time is unknown to their student as there is timetables provided on the arrival time of the bus.Due to this limitation, the student of UiTM Shah Alam are most likely to waste most of their precious time which can be use to attend others important activities to wait for the bus. In order to avoid this kind of problem from occurring, a system is proposed which is to create a scheduling algorithm to calculate the arrival time of the bus which is then provide the students with the timetables. Dijkstra algorithm is one of the technique use in calculating the arrival time with high accuracy. In realizing this project, Waterfall Methodology Software Development is utilize in managing the project.lt is a methodology which focus on the quality of the requirement and design which is the most suitable for this project that emphasize on the accuracy of time. With the completion of this project, it is hope to provide the students with a timetable that shows the arrival time of the bus which can gives more benefits to the students.
format Thesis
qualification_level Bachelor degree
author Ahmad Pauzi, Muhd Hisyam Nursalam
author_facet Ahmad Pauzi, Muhd Hisyam Nursalam
author_sort Ahmad Pauzi, Muhd Hisyam Nursalam
title Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi
title_short Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi
title_full Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi
title_fullStr Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi
title_full_unstemmed Bus scheduling algorithm for UiTM Shah Alam / Muhd Hisyam Nursalam Ahmad Pauzi
title_sort bus scheduling algorithm for uitm shah alam / muhd hisyam nursalam ahmad pauzi
granting_institution Universiti Teknologi MARA (UiTM)
granting_department Faculty of Computer and Mathematical Sciences
publishDate 2017
url https://ir.uitm.edu.my/id/eprint/65953/1/65953.pdf
_version_ 1783735588357144576