A comparison on conventional method and industrialized building system (IBS) in Penang bridge construction / Rozianis Ahmad

Generally, construction industry throughout the world has positive perceptions on improving the overall construction industry performance. Therefore, construction industries in Malaysia are undergoing a change from a conventional technology to a more systematic and mechanized system technology like...

Full description

Saved in:
Bibliographic Details
Main Author: Ahmad, Rozianis
Format: Thesis
Language:English
Published: 2014
Online Access:https://ir.uitm.edu.my/id/eprint/71148/1/71148.PDF
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uitm-ir.71148
record_format uketd_dc
spelling my-uitm-ir.711482023-11-26T04:20:35Z A comparison on conventional method and industrialized building system (IBS) in Penang bridge construction / Rozianis Ahmad 2014 Ahmad, Rozianis Generally, construction industry throughout the world has positive perceptions on improving the overall construction industry performance. Therefore, construction industries in Malaysia are undergoing a change from a conventional technology to a more systematic and mechanized system technology like the new system now known as the Industrialized Building System (IBS). Either in bridge construction also give impact to our construction industry to change the method construction from conventional way to Industrialized Building System (IBS). This is because, Construction Industry Development Board (CIDB) has been actively promoting the use of Industrialized Building System (IBS)in Malaysian Construction Industry since 1998 although the building project in Malaysia is still limited if compared to CIDB's target. However the cost of IBS is more expensive to compare with the conventional method but in a long term, IBS method could guarantee for satisfaction towards users like comparison on bridge method construction in both Penang Bridge. The data for this study were obtained through observation, questionnaires and interview conducted at two types of bridge construction projects is First Penang BridgeE36 and Second Penang Bridge E28. 2014 Thesis https://ir.uitm.edu.my/id/eprint/71148/ https://ir.uitm.edu.my/id/eprint/71148/1/71148.PDF text en public degree Universiti Teknologi MARA (UiTM) Faculty of Architecture, Planning and Surveying Kaliwon, Julaida
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
advisor Kaliwon, Julaida
description Generally, construction industry throughout the world has positive perceptions on improving the overall construction industry performance. Therefore, construction industries in Malaysia are undergoing a change from a conventional technology to a more systematic and mechanized system technology like the new system now known as the Industrialized Building System (IBS). Either in bridge construction also give impact to our construction industry to change the method construction from conventional way to Industrialized Building System (IBS). This is because, Construction Industry Development Board (CIDB) has been actively promoting the use of Industrialized Building System (IBS)in Malaysian Construction Industry since 1998 although the building project in Malaysia is still limited if compared to CIDB's target. However the cost of IBS is more expensive to compare with the conventional method but in a long term, IBS method could guarantee for satisfaction towards users like comparison on bridge method construction in both Penang Bridge. The data for this study were obtained through observation, questionnaires and interview conducted at two types of bridge construction projects is First Penang BridgeE36 and Second Penang Bridge E28.
format Thesis
qualification_level Bachelor degree
author Ahmad, Rozianis
spellingShingle Ahmad, Rozianis
A comparison on conventional method and industrialized building system (IBS) in Penang bridge construction / Rozianis Ahmad
author_facet Ahmad, Rozianis
author_sort Ahmad, Rozianis
title A comparison on conventional method and industrialized building system (IBS) in Penang bridge construction / Rozianis Ahmad
title_short A comparison on conventional method and industrialized building system (IBS) in Penang bridge construction / Rozianis Ahmad
title_full A comparison on conventional method and industrialized building system (IBS) in Penang bridge construction / Rozianis Ahmad
title_fullStr A comparison on conventional method and industrialized building system (IBS) in Penang bridge construction / Rozianis Ahmad
title_full_unstemmed A comparison on conventional method and industrialized building system (IBS) in Penang bridge construction / Rozianis Ahmad
title_sort comparison on conventional method and industrialized building system (ibs) in penang bridge construction / rozianis ahmad
granting_institution Universiti Teknologi MARA (UiTM)
granting_department Faculty of Architecture, Planning and Surveying
publishDate 2014
url https://ir.uitm.edu.my/id/eprint/71148/1/71148.PDF
_version_ 1783735940719575040