The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar

This dissertation contains six chapter that explain about the obligation of contractor during defect liability period. Chapter 1 are compilation of general information about my study. This chapter presents the overall content of the whole project writing. It introduces the subject matter, the proble...

全面介紹

Saved in:
書目詳細資料
主要作者: Ahmad Azhar, Muhamad Hafiz
格式: Thesis
語言:English
出版: 2014
在線閱讀:https://ir.uitm.edu.my/id/eprint/71294/1/71294.PDF
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
id my-uitm-ir.71294
record_format uketd_dc
spelling my-uitm-ir.712942023-12-10T10:42:34Z The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar 2014 Ahmad Azhar, Muhamad Hafiz This dissertation contains six chapter that explain about the obligation of contractor during defect liability period. Chapter 1 are compilation of general information about my study. This chapter presents the overall content of the whole project writing. It introduces the subject matter, the problems that are purported to solve. The objective is specified with an appropriate research method to achieve them .Chapter 2 are compilation of literature review. This chapter with the overview the common roles of contractor, preparing to start the contract and classification of contractor. In addition, this chapter also tell about the general information of defect liability period, process of defect liability period, case of defect liability period in Malaysia, and term and condition of defect liability period. 2014 Thesis https://ir.uitm.edu.my/id/eprint/71294/ https://ir.uitm.edu.my/id/eprint/71294/1/71294.PDF text en public degree Universiti Teknologi MARA (UiTM) Faculty of Architecture, Planning and Surveying Mahmood, Mahayudin
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
advisor Mahmood, Mahayudin
description This dissertation contains six chapter that explain about the obligation of contractor during defect liability period. Chapter 1 are compilation of general information about my study. This chapter presents the overall content of the whole project writing. It introduces the subject matter, the problems that are purported to solve. The objective is specified with an appropriate research method to achieve them .Chapter 2 are compilation of literature review. This chapter with the overview the common roles of contractor, preparing to start the contract and classification of contractor. In addition, this chapter also tell about the general information of defect liability period, process of defect liability period, case of defect liability period in Malaysia, and term and condition of defect liability period.
format Thesis
qualification_level Bachelor degree
author Ahmad Azhar, Muhamad Hafiz
spellingShingle Ahmad Azhar, Muhamad Hafiz
The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar
author_facet Ahmad Azhar, Muhamad Hafiz
author_sort Ahmad Azhar, Muhamad Hafiz
title The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar
title_short The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar
title_full The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar
title_fullStr The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar
title_full_unstemmed The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar
title_sort obligation of contractor during defect liability period / muhamad hafiz ahmad azhar
granting_institution Universiti Teknologi MARA (UiTM)
granting_department Faculty of Architecture, Planning and Surveying
publishDate 2014
url https://ir.uitm.edu.my/id/eprint/71294/1/71294.PDF
_version_ 1794191858083037184