The obligation of contractor during defect liability period / Muhamad Hafiz Ahmad Azhar
This dissertation contains six chapter that explain about the obligation of contractor during defect liability period. Chapter 1 are compilation of general information about my study. This chapter presents the overall content of the whole project writing. It introduces the subject matter, the proble...
Saved in:
主要作者: | Ahmad Azhar, Muhamad Hafiz |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2014
|
在线阅读: | https://ir.uitm.edu.my/id/eprint/71294/1/71294.PDF |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Contractor's liabilities towards employer's defective building work claims during defect liability period
由: Lim, Tze Shwan
出版: (2011) -
Contractor's liability relating to defective works that are discovered after the defects liability period
由: Leong, Mei Wan
出版: (2010) -
Defect study during defect liability period / Mohd Asrul Hassin
由: Hassin, Mohd Asrul
出版: (2010) -
Contractor's liability to third party for defective works
由: Mohmad Zainordi, Zainab
出版: (2006) -
The study on problems during defects liability period [DLP] / Rosli Abu Huraya
由: Abu Huraya, Rosli
出版: (2009)