Risk management of different contractual approaches in construction industry / Mohd Faizol Mohd Pauzi
Generally, there is no construction project without risk. Risk may effect constructions project negatively. Normally risks tend toward danger and potentially contributing to severe impact such as project delay and financial loss. Moreover, the effects that caused by the risk are difficult to be pred...
Saved in:
主要作者: | Mohd Pauzi, Mohd Faizol |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2007
|
主题: | |
在线阅读: | https://ir.uitm.edu.my/id/eprint/73494/1/73494.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Dependence of construction industry on foreign labour in Malaysia / Mohd Nazeri Mohammad
由: Mohammad, Mohd Nazeri
出版: (2006) -
A study on the effectiveness of CIDB Green Card in construction industries / Mohd Junaidi Jantan
由: Jantan, Mohd Junaidi
出版: (2008) -
Maintenance management for construction plant / Mohd Hafiz Abd Khalib
由: Abd Khalib, Mohd Hafiz
出版: (2006) -
The implementation of guideline during demolition work by local authority / Mohd Hadibi Bohari.
由: Bohari, Mohd Hadibi
出版: (2010) -
The effectiveness of building inspection by local authority in construction process / Mohd Fazli Masbor
由: Masbor, Mohd Fazli
出版: (2007)