Coordination and controlling method for construction project / Zaiti Kamsan

This dissertation report is based on a study about findings and analysis of coordination (scheduling) and controlling (planning) method for construction project. The comparisons case study are made in term of planning and scheduling techniques to give better management in time monitoring using metho...

Full description

Saved in:
Bibliographic Details
Main Author: Kamsan, Zaiti
Format: Thesis
Language:English
Published: 2006
Online Access:https://ir.uitm.edu.my/id/eprint/73883/1/73883.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uitm-ir.73883
record_format uketd_dc
spelling my-uitm-ir.738832023-02-15T07:13:23Z Coordination and controlling method for construction project / Zaiti Kamsan 2006 Kamsan, Zaiti This dissertation report is based on a study about findings and analysis of coordination (scheduling) and controlling (planning) method for construction project. The comparisons case study are made in term of planning and scheduling techniques to give better management in time monitoring using method of network analysis Critical Path Method (CPM). Objectives of this study are to identify the application of CPM in construction industry and its effectiveness. However, the application CPM needs expertise and experienced person to built effective and efficient in time monitoring, management resources and materials. In addition to, delay in construction project silently exist even used CPM as a guide to resolve problems. The recommendations are given to upgrade the performances of CPM as a method to coordinate and control construction projects to avoid any delay which uneconomically in terms of labour, material, machinery and money. 2006 Thesis https://ir.uitm.edu.my/id/eprint/73883/ https://ir.uitm.edu.my/id/eprint/73883/1/73883.pdf text en public degree Universiti Teknologi MARA (UiTM) Faculty of Architecture, Planning and Surveying Mohd Amin, Ghazali
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
advisor Mohd Amin, Ghazali
description This dissertation report is based on a study about findings and analysis of coordination (scheduling) and controlling (planning) method for construction project. The comparisons case study are made in term of planning and scheduling techniques to give better management in time monitoring using method of network analysis Critical Path Method (CPM). Objectives of this study are to identify the application of CPM in construction industry and its effectiveness. However, the application CPM needs expertise and experienced person to built effective and efficient in time monitoring, management resources and materials. In addition to, delay in construction project silently exist even used CPM as a guide to resolve problems. The recommendations are given to upgrade the performances of CPM as a method to coordinate and control construction projects to avoid any delay which uneconomically in terms of labour, material, machinery and money.
format Thesis
qualification_level Bachelor degree
author Kamsan, Zaiti
spellingShingle Kamsan, Zaiti
Coordination and controlling method for construction project / Zaiti Kamsan
author_facet Kamsan, Zaiti
author_sort Kamsan, Zaiti
title Coordination and controlling method for construction project / Zaiti Kamsan
title_short Coordination and controlling method for construction project / Zaiti Kamsan
title_full Coordination and controlling method for construction project / Zaiti Kamsan
title_fullStr Coordination and controlling method for construction project / Zaiti Kamsan
title_full_unstemmed Coordination and controlling method for construction project / Zaiti Kamsan
title_sort coordination and controlling method for construction project / zaiti kamsan
granting_institution Universiti Teknologi MARA (UiTM)
granting_department Faculty of Architecture, Planning and Surveying
publishDate 2006
url https://ir.uitm.edu.my/id/eprint/73883/1/73883.pdf
_version_ 1783735993664274432