A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen

Complex infrastructure projects, such as highways, bridges, ports, airports, and mass transit, have been characterised as large-scale capital expenditure, longer completion period, require specific technical and more process complexity levels. Their complexity level regardless of their size, cost, l...

Full description

Saved in:
Bibliographic Details
Main Author: Che Nen, Akhtarul Norfaiza
Format: Thesis
Language:English
Published: 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/78319/1/78319.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uitm-ir.78319
record_format uketd_dc
spelling my-uitm-ir.783192023-06-01T07:00:45Z A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen 2022 Che Nen, Akhtarul Norfaiza Infrastructure (Economics). Capital. Capital productivity Construction industry Complex infrastructure projects, such as highways, bridges, ports, airports, and mass transit, have been characterised as large-scale capital expenditure, longer completion period, require specific technical and more process complexity levels. Their complexity level regardless of their size, cost, longer duration, and less quality that expected prone to three main consequences during construction including, several design changes, land acquisition, and delaying approval process. Those consequences are warranted an ineffective tool for assessing and managing that complexity factors. So far, several empirical studies pertaining to complex factors reported on weak impact of tripartite project performance (time, cost, and quality) during triple project phases. Hence the project complexity tools still lacking and waiting to be explore either qualitative or quantitative measures throughout the project phases (pre-construction, construction, & post-construction). 2022 Thesis https://ir.uitm.edu.my/id/eprint/78319/ https://ir.uitm.edu.my/id/eprint/78319/1/78319.pdf text en public phd doctoral Universiti Teknologi MARA (UiTM) College of Engineering Mat Isa, Che Maznah
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
advisor Mat Isa, Che Maznah
topic Infrastructure (Economics)
Capital
Capital productivity
Construction industry
spellingShingle Infrastructure (Economics)
Capital
Capital productivity
Construction industry
Che Nen, Akhtarul Norfaiza
A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen
description Complex infrastructure projects, such as highways, bridges, ports, airports, and mass transit, have been characterised as large-scale capital expenditure, longer completion period, require specific technical and more process complexity levels. Their complexity level regardless of their size, cost, longer duration, and less quality that expected prone to three main consequences during construction including, several design changes, land acquisition, and delaying approval process. Those consequences are warranted an ineffective tool for assessing and managing that complexity factors. So far, several empirical studies pertaining to complex factors reported on weak impact of tripartite project performance (time, cost, and quality) during triple project phases. Hence the project complexity tools still lacking and waiting to be explore either qualitative or quantitative measures throughout the project phases (pre-construction, construction, & post-construction).
format Thesis
qualification_name Doctor of Philosophy (PhD.)
qualification_level Doctorate
author Che Nen, Akhtarul Norfaiza
author_facet Che Nen, Akhtarul Norfaiza
author_sort Che Nen, Akhtarul Norfaiza
title A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen
title_short A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen
title_full A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen
title_fullStr A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen
title_full_unstemmed A two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in Malaysia / Akhtarul Norfaiza Che Nen
title_sort two-dimensional integrated complexity factors assessment framework for infrastructure project performance and phases in malaysia / akhtarul norfaiza che nen
granting_institution Universiti Teknologi MARA (UiTM)
granting_department College of Engineering
publishDate 2022
url https://ir.uitm.edu.my/id/eprint/78319/1/78319.pdf
_version_ 1783736238478458880