Electrical installation challenges in steel framing system: Case study at District of Kuala Muda / Nur Husnina Zawari
Industrialized Building System (IBS) have start begin in Malaysia in early years 1960s and it is known as the precast concrete or prefabricated concrete. The Industrialize Building System (IBS) is prefabrication concrete that will involves the manufacture of components such as wall off site that ar...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2021
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/82887/1/82887.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!