Lightning risk assessment for structure at remote location / Mohammad Rafeuddien Arifin

This paper presents the method of lightning risk assessment for the structure by using the Malaysian Standard. The aim of this study is to determine the risk for the structure located at remote area from lightning activity and to provide the suitable lightning protection measures in order to reduce...

Full description

Saved in:
Bibliographic Details
Main Author: Arifin, Mohammad Rafeuddien
Format: Thesis
Language:English
Published: 2011
Online Access:https://ir.uitm.edu.my/id/eprint/84725/1/84725.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uitm-ir.84725
record_format uketd_dc
spelling my-uitm-ir.847252024-04-23T09:22:39Z Lightning risk assessment for structure at remote location / Mohammad Rafeuddien Arifin 2011 Arifin, Mohammad Rafeuddien This paper presents the method of lightning risk assessment for the structure by using the Malaysian Standard. The aim of this study is to determine the risk for the structure located at remote area from lightning activity and to provide the suitable lightning protection measures in order to reduce the risk for the structure lower than tolerable risk. To achieve this aim, the following objectives have been identified: to evaluate the risk analysis for the structure using Malaysian Standard and to determine the suitable protection for the structure. In order to evaluate whether or not lightning protection of an object is needed, risk assessment in accordance with the procedures contained in IEC MS 62305. This method will allow more precise selection of lightning protection devices. Based on the assessment, the risk, R! shall be determined and compared with the tolerable value RT= 10"3. The protection is required if the risk Ri is higher than tolerable risk, RT. Based on the calculation, the value of Ri = 1.7972x10"3 is higher than the tolerable value, RT = 10"3, the lightning protection is required for the structure. To reduce the risk Ri, the best solutions is to install coordinated SPD at the service entrance to protect both power and telecom lines. 2011 Thesis https://ir.uitm.edu.my/id/eprint/84725/ https://ir.uitm.edu.my/id/eprint/84725/1/84725.pdf text en public degree Universiti Teknologi MARA (UiTM) Faculty of Electrical Engineering Johari, Dalina
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
advisor Johari, Dalina
description This paper presents the method of lightning risk assessment for the structure by using the Malaysian Standard. The aim of this study is to determine the risk for the structure located at remote area from lightning activity and to provide the suitable lightning protection measures in order to reduce the risk for the structure lower than tolerable risk. To achieve this aim, the following objectives have been identified: to evaluate the risk analysis for the structure using Malaysian Standard and to determine the suitable protection for the structure. In order to evaluate whether or not lightning protection of an object is needed, risk assessment in accordance with the procedures contained in IEC MS 62305. This method will allow more precise selection of lightning protection devices. Based on the assessment, the risk, R! shall be determined and compared with the tolerable value RT= 10"3. The protection is required if the risk Ri is higher than tolerable risk, RT. Based on the calculation, the value of Ri = 1.7972x10"3 is higher than the tolerable value, RT = 10"3, the lightning protection is required for the structure. To reduce the risk Ri, the best solutions is to install coordinated SPD at the service entrance to protect both power and telecom lines.
format Thesis
qualification_level Bachelor degree
author Arifin, Mohammad Rafeuddien
spellingShingle Arifin, Mohammad Rafeuddien
Lightning risk assessment for structure at remote location / Mohammad Rafeuddien Arifin
author_facet Arifin, Mohammad Rafeuddien
author_sort Arifin, Mohammad Rafeuddien
title Lightning risk assessment for structure at remote location / Mohammad Rafeuddien Arifin
title_short Lightning risk assessment for structure at remote location / Mohammad Rafeuddien Arifin
title_full Lightning risk assessment for structure at remote location / Mohammad Rafeuddien Arifin
title_fullStr Lightning risk assessment for structure at remote location / Mohammad Rafeuddien Arifin
title_full_unstemmed Lightning risk assessment for structure at remote location / Mohammad Rafeuddien Arifin
title_sort lightning risk assessment for structure at remote location / mohammad rafeuddien arifin
granting_institution Universiti Teknologi MARA (UiTM)
granting_department Faculty of Electrical Engineering
publishDate 2011
url https://ir.uitm.edu.my/id/eprint/84725/1/84725.pdf
_version_ 1804889735399735296