Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi

This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection...

全面介紹

Saved in:
書目詳細資料
主要作者: Abdullah Azmi, Musafri
格式: Thesis
語言:English
出版: 2010
主題:
在線閱讀:https://ir.uitm.edu.my/id/eprint/84816/1/84816.pdf
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
id my-uitm-ir.84816
record_format uketd_dc
spelling my-uitm-ir.848162024-03-26T02:37:53Z Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi 2010 Abdullah Azmi, Musafri Electric power distribution. Electric power transmission This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection systems are sets of equipments to detect faults in the protected elements of the power systems, to disconnect the faulted element and to re-establish the service. This paper approach for over current and earth fault as protection system. Protective device coordination is the process of determining the best timing of current interruption when abnormal electrical conditions occur. 2010 Thesis https://ir.uitm.edu.my/id/eprint/84816/ https://ir.uitm.edu.my/id/eprint/84816/1/84816.pdf text en public degree Universiti Teknologi MARA (UiTM) Faculty of Electrical Engineering Nik Ismail, Nik Fasdi
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
advisor Nik Ismail, Nik Fasdi
topic Electric power distribution
Electric power transmission
spellingShingle Electric power distribution
Electric power transmission
Abdullah Azmi, Musafri
Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi
description This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection systems are sets of equipments to detect faults in the protected elements of the power systems, to disconnect the faulted element and to re-establish the service. This paper approach for over current and earth fault as protection system. Protective device coordination is the process of determining the best timing of current interruption when abnormal electrical conditions occur.
format Thesis
qualification_level Bachelor degree
author Abdullah Azmi, Musafri
author_facet Abdullah Azmi, Musafri
author_sort Abdullah Azmi, Musafri
title Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi
title_short Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi
title_full Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi
title_fullStr Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi
title_full_unstemmed Overcurrent and earth fault relay setting and coordination using PSS-Adept / Musafri Abdullah Azmi
title_sort overcurrent and earth fault relay setting and coordination using pss-adept / musafri abdullah azmi
granting_institution Universiti Teknologi MARA (UiTM)
granting_department Faculty of Electrical Engineering
publishDate 2010
url https://ir.uitm.edu.my/id/eprint/84816/1/84816.pdf
_version_ 1804889738446897152