The determination of productivity index in construction process / Amlan Yunus
Labor productivity is defined as the input divided by the output, and is calculated for a finite time interval the following way: Labor Productivity = Manhours/Units of Work It is commonly called the unit rate. The need for a standardized approach for measuring construction task-level labor producti...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
1990
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/99749/1/99749.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-uitm-ir.99749 |
---|---|
record_format |
uketd_dc |
spelling |
my-uitm-ir.997492024-09-12T03:15:49Z The determination of productivity index in construction process / Amlan Yunus 1990 Yunus, Amlan Labor. Work. Working class Labor productivity is defined as the input divided by the output, and is calculated for a finite time interval the following way: Labor Productivity = Manhours/Units of Work It is commonly called the unit rate. The need for a standardized approach for measuring construction task-level labor productivity has long been recognized. Furthermore it is known that before the factors affecting productivity can be studied, there needs to be a large data base containing information from many project constructed under a variety of conditions. This information must be uniformly collected from each project. The objective of this project is to describe a task level labor productivity measurement and performance evaluation system that can be used by owners, contractors, and subcontractors who presently do not have a formalized effort. 1990 Thesis https://ir.uitm.edu.my/id/eprint/99749/ https://ir.uitm.edu.my/id/eprint/99749/1/99749.pdf text en public advanced_diploma Universiti Teknologi MARA (UiTM) Faculty of Civil Engineering |
institution |
Universiti Teknologi MARA |
collection |
UiTM Institutional Repository |
language |
English |
topic |
Labor Work Working class |
spellingShingle |
Labor Work Working class Yunus, Amlan The determination of productivity index in construction process / Amlan Yunus |
description |
Labor productivity is defined as the input divided by the output, and is calculated for a finite time interval the following way: Labor Productivity = Manhours/Units of Work It is commonly called the unit rate. The need for a standardized approach for measuring construction task-level labor productivity has long been recognized. Furthermore it is known that before the factors affecting productivity can be studied, there needs to be a large data base containing information from many project constructed under a variety of conditions. This information must be uniformly collected from each project. The objective of this project is to describe a task level labor productivity measurement and performance evaluation system that can be used by owners, contractors, and subcontractors who presently do not have a formalized effort. |
format |
Thesis |
qualification_level |
advanced_diploma |
author |
Yunus, Amlan |
author_facet |
Yunus, Amlan |
author_sort |
Yunus, Amlan |
title |
The determination of productivity index in construction process / Amlan Yunus |
title_short |
The determination of productivity index in construction process / Amlan Yunus |
title_full |
The determination of productivity index in construction process / Amlan Yunus |
title_fullStr |
The determination of productivity index in construction process / Amlan Yunus |
title_full_unstemmed |
The determination of productivity index in construction process / Amlan Yunus |
title_sort |
determination of productivity index in construction process / amlan yunus |
granting_institution |
Universiti Teknologi MARA (UiTM) |
granting_department |
Faculty of Civil Engineering |
publishDate |
1990 |
url |
https://ir.uitm.edu.my/id/eprint/99749/1/99749.pdf |
_version_ |
1811769027407642624 |