Modelling success factors influencing industrialized building system project performance using dematel
Industrialized Building System (IBS) is the term to represent the prefabrication concept in the Malaysian construction industry that uses standardized building components mass produced in a factory or on the site. Adoption of IBS in Malaysia in still very low whereby only 10% of total awarded projec...
محفوظ في:
المؤلف الرئيسي: | Yusmin, Jaffar |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2021
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://umpir.ump.edu.my/id/eprint/35289/1/14.Modelling%20success%20factors%20influencing%20industrialized%20building%20system%20project%20performance%20using%20dematel.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Factors affecting design & build construction project success in Manila, Philippines
بواسطة: Yip, Hock Seng
منشور في: (2019) -
The impacts of the university policies during covid-19 pandemic towards academic operation, financial, facilities and staff operation in universiti malaysia pahang: A dematel based model
بواسطة: Azrizulazmi, Bustan
منشور في: (2022) -
Renewable energy project success in malaysia: the influence of stakeholder engagement indicators with the moderating effect of renewable energy policy implementation
بواسطة: Zarith Sufia, Azlan
منشور في: (2022) -
The Critical Success Factors Of TQM Implementation In Malaysian SMES
بواسطة: Roozbahani, Mahsa
منشور في: (2011) -
Micro antecedents of absorptive capacity: Implications of social context in joint project teams in Nigerian Upstream oil industry
بواسطة: Oluwaseyi Ojo, Adedapo
منشور في: (2014)