Mathematical model of CPM/PERT network in project management using taylor's expansion
Failure to complete a project management either by the original planned time or budget, or both, ultimately results in project delays. Project delays may caused by a number of changes in a project, including late completion, loss of possible early completion, or acceleration of the work. Finally, t...
محفوظ في:
المؤلف الرئيسي: | |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
الموضوعات: | |
الوصول للمادة أونلاين: | http://umt-ir.umt.edu.my:8080/jspui/bitstream/123456789/1975/1/HD%2069%20.P75%20T4%202011%20Abstract.pdf http://umt-ir.umt.edu.my:8080/jspui/bitstream/123456789/1975/2/HD%2069%20.P75%20T4%202011%20FullText.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
id |
my-umt-ir.-1975 |
---|---|
record_format |
uketd_dc |
spelling |
my-umt-ir.-19752012-10-08T03:59:33Z Mathematical model of CPM/PERT network in project management using taylor's expansion Ten, Wei Peng Failure to complete a project management either by the original planned time or budget, or both, ultimately results in project delays. Project delays may caused by a number of changes in a project, including late completion, loss of possible early completion, or acceleration of the work. Finally, the relationship among the owner, project manager, project team, project sponsor, vendors, suppliers, client and others can be negatively affected by the disputes, claims, abandonment, or termination resulting from delays. Terengganu: Universiti Malaysia Terengganu 2011-07 Thesis en http://hdl.handle.net/123456789/1975 http://umt-ir.umt.edu.my:8080/jspui/bitstream/123456789/1975/1/HD%2069%20.P75%20T4%202011%20Abstract.pdf ac12c94b6579beba5d39c0ef55de9980 http://umt-ir.umt.edu.my:8080/jspui/bitstream/123456789/1975/2/HD%2069%20.P75%20T4%202011%20FullText.pdf bbc2c7a6c829cd6f652b7dbea310c378 http://umt-ir.umt.edu.my:8080/jspui/bitstream/123456789/1975/3/license.txt 8a4605be74aa9ea9d79846c1fba20a33 HD 69 .P75 T4 2011 Ten, Wei Peng Tesis FST 2011 Project management -- Mathematical models |
institution |
Universiti Malaysia Terengganu |
collection |
UMT Repository System |
language |
English |
topic |
HD 69 .P75 T4 2011 HD 69 .P75 T4 2011 Tesis FST 2011 Project management -- Mathematical models |
spellingShingle |
HD 69 .P75 T4 2011 HD 69 .P75 T4 2011 Tesis FST 2011 Project management -- Mathematical models Ten, Wei Peng Mathematical model of CPM/PERT network in project management using taylor's expansion |
description |
Failure to complete a project management either by the original planned time or
budget, or both, ultimately results in project delays. Project delays may caused by a number of changes in a project, including late completion, loss of possible early completion, or acceleration of the work. Finally, the relationship among the owner,
project manager, project team, project sponsor, vendors, suppliers, client and others
can be negatively affected by the disputes, claims, abandonment, or termination
resulting from delays. |
format |
Thesis |
author |
Ten, Wei Peng |
author_facet |
Ten, Wei Peng |
author_sort |
Ten, Wei Peng |
title |
Mathematical model of CPM/PERT network in project management using taylor's expansion |
title_short |
Mathematical model of CPM/PERT network in project management using taylor's expansion |
title_full |
Mathematical model of CPM/PERT network in project management using taylor's expansion |
title_fullStr |
Mathematical model of CPM/PERT network in project management using taylor's expansion |
title_full_unstemmed |
Mathematical model of CPM/PERT network in project management using taylor's expansion |
title_sort |
mathematical model of cpm/pert network in project management using taylor's expansion |
granting_institution |
Terengganu: Universiti Malaysia Terengganu |
url |
http://umt-ir.umt.edu.my:8080/jspui/bitstream/123456789/1975/1/HD%2069%20.P75%20T4%202011%20Abstract.pdf http://umt-ir.umt.edu.my:8080/jspui/bitstream/123456789/1975/2/HD%2069%20.P75%20T4%202011%20FullText.pdf |
_version_ |
1747835844020928512 |