Analysis and modelling of cyclic loading power transformer
Transformers can transfer the required electricity to the residential, commercial and industrial are~ to fulfil the consumption demand. This study targets to determine the permitted overloading conditions and to maximize the electricity supply without reducing the lifespan of the transformer by sett...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/13549/2/Shen%20%28fulltext%29.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-unimas-ir.13549 |
---|---|
record_format |
uketd_dc |
spelling |
my-unimas-ir.135492023-05-08T07:33:30Z Analysis and modelling of cyclic loading power transformer 2010 Thye, Hun Shen TJ Mechanical engineering and machinery Transformers can transfer the required electricity to the residential, commercial and industrial are~ to fulfil the consumption demand. This study targets to determine the permitted overloading conditions and to maximize the electricity supply without reducing the lifespan of the transformer by setting the necessary transformer parameters. This study concludes that the loading curve pattern and power usage are very much dependent on the distribution network in each substation. The permitted overloading conditions for Planned Load Beyond Nameplate (PLBN), Long-Time Emergency Load (LTE) and Short-Time Emergency load (STE) are estimated. The parameters of the transformer, i.e. loss of life, permitted overloading conditions and maximum load capacity were examined in this study. The evaluated results reveal that the transformer's loss of life correlates to the capacity loading curve pattern, power factor and ambient temperature. Besides, the transformer's loss of life is highly dependent on the capacity loading curve pattern. Other information, namely loading curve pattern, power factor and factory test acceptance (F AT) reports are referred as well. Results reveal that the loss of life for each transformer is approximately 0.0 % over 30 years of lifespan. The results imply that the lifespan of every transformer in the substations can last for over 30 years. Universiti Malaysia Sarawak, (UNIMAS) 2010 Thesis http://ir.unimas.my/id/eprint/13549/ http://ir.unimas.my/id/eprint/13549/2/Shen%20%28fulltext%29.pdf text en validuser masters Universiti Malaysia Sarawak, (UNIMAS) Faculty of Engineering |
institution |
Universiti Malaysia Sarawak |
collection |
UNIMAS Institutional Repository |
language |
English |
topic |
TJ Mechanical engineering and machinery |
spellingShingle |
TJ Mechanical engineering and machinery Thye, Hun Shen Analysis and modelling of cyclic loading power transformer |
description |
Transformers can transfer the required electricity to the residential, commercial and industrial are~ to fulfil the consumption demand. This study targets to determine the permitted overloading conditions and to maximize the electricity supply without reducing the lifespan of the transformer by setting the necessary transformer parameters. This study concludes that the loading curve pattern and power usage are very much dependent on the distribution network in each substation. The permitted overloading conditions for Planned Load Beyond Nameplate (PLBN), Long-Time Emergency Load (LTE) and Short-Time Emergency load (STE) are estimated. The parameters of the transformer, i.e. loss of life, permitted overloading conditions and maximum load capacity were examined in this study. The evaluated results reveal that the transformer's loss of life correlates to the capacity loading curve pattern, power factor and ambient temperature. Besides, the transformer's loss of life is highly dependent on the capacity loading curve pattern. Other information, namely loading curve pattern, power factor and factory test acceptance (F AT) reports are referred as well. Results reveal that the loss of life for each transformer is approximately 0.0 % over 30 years of lifespan. The results imply that the lifespan of every transformer in the substations can last for over 30 years. |
format |
Thesis |
qualification_level |
Master's degree |
author |
Thye, Hun Shen |
author_facet |
Thye, Hun Shen |
author_sort |
Thye, Hun Shen |
title |
Analysis and modelling of cyclic loading power transformer |
title_short |
Analysis and modelling of cyclic loading power transformer |
title_full |
Analysis and modelling of cyclic loading power transformer |
title_fullStr |
Analysis and modelling of cyclic loading power transformer |
title_full_unstemmed |
Analysis and modelling of cyclic loading power transformer |
title_sort |
analysis and modelling of cyclic loading power transformer |
granting_institution |
Universiti Malaysia Sarawak, (UNIMAS) |
granting_department |
Faculty of Engineering |
publishDate |
2010 |
url |
http://ir.unimas.my/id/eprint/13549/2/Shen%20%28fulltext%29.pdf |
_version_ |
1783728134414139392 |