The impact of Sejingkat coal-fired power plant on the water quality of Sarawak River
The demand for electricity is clearly associated with population growth. Thus, the Kuching Coal-Fired Power Plant located at Sejingkat area was built to cater for this needs. With the operation of Phase II, the impact to the water quality of the Sarawak River is not known. In view of this fact, s...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2006
|
主题: | |
在线阅读: | http://ir.unimas.my/id/eprint/14815/1/Anita%20Bruin%20ft.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|