Design, Develop And Techno-Economical Study of a Run-of-the-Weir Micro Hydro System for a Sensitive Site
This project aimed to harness mechanical energy of exhaust cooling water running continuously in a discharge weir of a base load power plant. However, three major problems were encountered: the site is an operating artificial site, the exhaust cooling water is heated sea water, and the custom syste...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/21009/1/Chuan.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This project aimed to harness mechanical energy of exhaust cooling water running continuously in a discharge weir of a base load power plant. However, three major problems
were encountered: the site is an operating artificial site, the exhaust cooling water is heated sea water, and the custom system is required to be flexible. These problems necessitate a custom design. This custom system was developed from scratch; it was designed, fabricated
and installed very differently compared to other micro hydros. As a novel system, it was evaluated in two aspects – through economic and performance study. Due to safety reasons, the system underwent proof run for a three-month period, without involving extensive on-site
experimentation. Therefore, physical and mathematical modeling, as well as parametric study, were carried out to complement the evaluation. Results obtained showed that the hybrid turbine was indeed a reaction turbine, the custom system was capable of reaching 45% efficiency, and its payback period was estimated as 4.23 years. All in all, the system is feasible for the sensitive site application. |
---|